Partial Discharge Analysis for Predictive Maintenance of Generator of Geothermal Power Plant

被引:0
|
作者
Darwanto, Djoko [1 ]
Hamdani, Deny [1 ]
Hariyanto, Didik Dwi [2 ]
Karyawan, Otto Hari
机构
[1] Inst Teknol Bandung, Sch Elect Engn & Informat, Jl Ganesha 10, Bandung 40132, Indonesia
[2] PT Pertamina, Jakarta 10110, Indonesia
关键词
predictive maintenance; insulation; partial discharge; geothermal;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Generator is one of the most important apparatuses highly responsible for production process. Predictive maintainance is necessary for its high availability and reliability. It is reported that about 37% of problems of disruptive generator is caused by stator winding and about 40% of those problems is caused by disruptive insulation, to which partial discharge (PD) contributes. This paper presents partial discharge (PD) analysis for predictivie maintenance of generator of geothermal power plant. PD measurement was on-line conducted in a geothermal power plant using TGA-B IRIS Power with capacitor-coupled method and quarter system. The measurement data was used to determine PD type and its location for diagnostic purpose. Further, the analysis result and condition assessment became the basis of predictive maintenance.
引用
收藏
页码:736 / 739
页数:4
相关论文
共 50 条
  • [1] Statistical Analysis of Partial Discharge Characteristics for Predictive Maintenance of Generator of Geothermal Power Plant
    Darwanto, Djoko
    Hamdani, Deny
    Hariyanto, Didik Dwi
    Karyawan, Otto Hari
    PROCEEDINGS OF 2012 IEEE INTERNATIONAL CONFERENCE ON CONDITION MONITORING AND DIAGNOSIS (IEEE CMD 2012), 2012, : 1003 - 1006
  • [2] Partial Discharge Signals Detecting and Preventive Maintenance Planning for 21 kV Generator Case Study of a Generator at the Combined cycle Power Plant of Ratchaburi Power Company Limited
    Jitjing, Pinit
    Suppitaksakul, Chatchai
    Boonphen, Warunyu
    2018 15TH INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING/ELECTRONICS, COMPUTER, TELECOMMUNICATIONS AND INFORMATION TECHNOLOGY (ECTI-CON), 2018, : 41 - 44
  • [3] APPLICATION OF PARTIAL DISCHARGE TESTING TO HYDRO GENERATOR MAINTENANCE
    KURTZ, M
    LYLES, JF
    STONE, GC
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1984, 103 (08): : 2148 - 2157
  • [4] Geothermal Power Plant Maintenance: Evaluating Maintenance System Needs Using Quantitative Kano Analysis
    Atlason, Reynir S.
    Oddsson, Gudmundur V.
    Unnthorsson, Runar
    ENERGIES, 2014, 7 (07) : 4169 - 4184
  • [5] Using partial discharge measurement technology to implement predictive maintenance in high voltage motor and generator stator windings
    Stone, G
    Kapler, J
    1997 IEEE/PCA CEMENT INDUSTRY TECHNICAL CONFERENCE - XXXIX CONFERENCE RECORD, 1997, : 63 - 68
  • [6] Thermoelectric power generator: Field test at Bottle Rock geothermal power plant
    Li, Kewen
    Garrison, Geoffrey
    Zhu, Yuhao
    Moore, Michael
    Liu, Changwei
    Hepper, Jay
    Bandt, Larry
    Horne, Roland
    Petty, Susan
    JOURNAL OF POWER SOURCES, 2021, 485
  • [7] Application of partial discharge testing to motor and generator stator winding maintenance
    Stone, GC
    Sedding, HG
    Costello, MJ
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 1996, 32 (02) : 459 - 464
  • [8] Application of partial discharge testing to motor and generator stator winding maintenance
    Power Engineering Inc, Mississauga, Canada
    IEEE Trans Ind Appl, 2 (459-464):
  • [9] GEOTHERMAL POWER-PLANT DESIGN WITH OPERATION AND MAINTENANCE IN MIND
    GONSALVES, D
    KNOX, LA
    NEW HORIZONS, 1988, 12 : 385 - 387
  • [10] On-Site Partial Discharge Monitoring System in Generator at Tanjung Bin Power Plant, Johor, Malaysia
    Muhamad, A. H.
    Arief, Y. Z.
    Izzati, W. A.
    Adzis, Z.
    Sidik, M. A. B.
    JURNAL TEKNOLOGI, 2013, 64 (04):