Sharing Tacit Knowledge for Integrated Project Team Flexibility: Case Study of Integrated Project Delivery

被引:74
|
作者
Zhang, Lianying [1 ]
He, Jing [1 ]
Zhou, Shuguo [1 ]
机构
[1] Tianjin Univ, Sch Management, Tianjin 300072, Peoples R China
基金
中国国家自然科学基金;
关键词
Tacit knowledge sharing; Team flexibility; Integrated project team; Social network analysis; Tacit knowledge; Knowledge sharing; Construction management; SOCIAL NETWORK ANALYSIS; MANAGEMENT; PERFORMANCE; ORGANIZATIONS; SYSTEMS; PRODUCT; DESIGN;
D O I
10.1061/(ASCE)CO.1943-7862.0000645
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The integrated project team has received wide attention and acceptance in the construction industry due to the adversarial nature of traditional contracting. With a growing trend toward the integration of all project parties, team flexibility emerges as an important factor to the success of more complex and dynamic construction projects. This research focuses on the flexibility of the integrated project team and explores its antecedents. Based on the literature that has found team flexibility is dependent on team dynamic capabilities, team dynamic capabilities was further studied and it was found that tacit knowledge sharing serves as a determinant of team flexibility at a deeper level. A case study was conducted on an integrated project delivery (IPD) project at its early stage. By using social network analysis, it was found that tacit knowledge sharing leads to the integrated project team flexibility through building connections between team members and increasing team dynamic capabilities. The primary contribution of this study is finding the linkage from tacit knowledge sharing to the integrated project team flexibility, which can provide a theoretical guide for the integrated project team to improve its ability to survive in the dynamic environment of construction projects. (C) 2013 American Society of Civil Engineers.
引用
收藏
页码:795 / 804
页数:10
相关论文
共 50 条
  • [21] Integrated Project Delivery: The Obstacles of Implementation
    Fish, Amanda J.
    Keen, Julia
    [J]. ASHRAE TRANSACTIONS 2012, VOL 118, PT 1, 2012, 118 : 90 - 97
  • [22] Last planner and integrated project delivery
    Cho, Seongkyun
    Ballard, Glenn
    [J]. Lean Construction Journal, 2011, 2011 : 67 - 73
  • [23] Optimum risk/reward sharing framework to incentivize integrated project delivery adoption
    Ma, Qiuwen
    Cheung, Sai On
    Li, Shan
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2023, 41 (06) : 519 - 535
  • [24] Organizational structuring and project team structuring in integrated product development project
    Rauniar, Rupak
    Rawski, Greg
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 135 (02) : 939 - 952
  • [25] Winter chiller alternative project using integrated project delivery
    Parolise, Amanda
    [J]. Engineered Systems, 2019, 36 (10): : 10 - 12
  • [26] Evaluating Integrated Project Delivery Using the Project Quarterback Rating
    El Asmar, Mounir
    Hanna, Awad S.
    Loh, Wei-Yin
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (01)
  • [27] Construction Project Team Knowledge Sharing Mechanism Building
    Liu, Xiufeng
    Zhang, Qingpu
    [J]. PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 279 - 282
  • [28] Adoption of Integrated Project Delivery Practices for Superior Project Performance
    Ling, Florence Y. Y.
    Teo, Pei Xin
    Li, Shan
    Zhang, Zhe
    Ma, Qiuwen
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (04)
  • [29] Documenting the Interactive Effects of Project Manager and Team-Level Communication Behaviors in Integrated Project Delivery Teams
    Manata, Brian
    Miller, Vernon D.
    Mollaoglu, Sinem
    Garcia, Angelo J.
    [J]. PROJECT MANAGEMENT JOURNAL, 2022, 53 (01) : 33 - 48
  • [30] Knowledge-Sharing Culture, Project-Team Interaction, and Knowledge-Sharing Performance among Project Members
    Ni, Guodong
    Cui, Qingbin
    Sang, Linhua
    Wang, Wenshun
    Xia, Dongchun
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (02)