Sharing Tacit Knowledge for Integrated Project Team Flexibility: Case Study of Integrated Project Delivery

被引:74
|
作者
Zhang, Lianying [1 ]
He, Jing [1 ]
Zhou, Shuguo [1 ]
机构
[1] Tianjin Univ, Sch Management, Tianjin 300072, Peoples R China
基金
中国国家自然科学基金;
关键词
Tacit knowledge sharing; Team flexibility; Integrated project team; Social network analysis; Tacit knowledge; Knowledge sharing; Construction management; SOCIAL NETWORK ANALYSIS; MANAGEMENT; PERFORMANCE; ORGANIZATIONS; SYSTEMS; PRODUCT; DESIGN;
D O I
10.1061/(ASCE)CO.1943-7862.0000645
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The integrated project team has received wide attention and acceptance in the construction industry due to the adversarial nature of traditional contracting. With a growing trend toward the integration of all project parties, team flexibility emerges as an important factor to the success of more complex and dynamic construction projects. This research focuses on the flexibility of the integrated project team and explores its antecedents. Based on the literature that has found team flexibility is dependent on team dynamic capabilities, team dynamic capabilities was further studied and it was found that tacit knowledge sharing serves as a determinant of team flexibility at a deeper level. A case study was conducted on an integrated project delivery (IPD) project at its early stage. By using social network analysis, it was found that tacit knowledge sharing leads to the integrated project team flexibility through building connections between team members and increasing team dynamic capabilities. The primary contribution of this study is finding the linkage from tacit knowledge sharing to the integrated project team flexibility, which can provide a theoretical guide for the integrated project team to improve its ability to survive in the dynamic environment of construction projects. (C) 2013 American Society of Civil Engineers.
引用
收藏
页码:795 / 804
页数:10
相关论文
共 50 条
  • [1] Critical Factors Affecting Tacit-Knowledge Sharing within the Integrated Project Team
    Zhang, Lianying
    He, Jing
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (02)
  • [2] Study of Tacit Knowledge Mining and Sharing in a Project Team
    Zhang, Aijing
    Zhang, Qingpu
    [J]. PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 273 - 278
  • [3] Study of Tacit Knowledge Sharing and Innovating in the Real Estate Enterprise's Project Team
    Chen, Yanhua
    Wu, Chong
    [J]. PROCEEDINGS OF 2012 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2012, : 532 - 535
  • [4] Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode
    Zhang L.
    Li Y.
    Wu Q.
    [J]. Journal of The Institution of Engineers (India): Series A, 2013, 94 (2) : 109 - 115
  • [5] Transforming project delivery: integrated project delivery
    Ashcraft, Howard
    [J]. OXFORD REVIEW OF ECONOMIC POLICY, 2022, 38 (02) : 369 - 384
  • [6] Contracting Methods for Integrated Project Delivery: A Healthcare Case Study
    Mulholland, Sean
    Clevenger, Caroline
    [J]. CONSTRUCTION RESEARCH CONGRESS 2018: INFRASTRUCTURE AND FACILITY MANAGEMENT, 2018, : 191 - 201
  • [7] Tacit knowledge sharing and transfer in an architectural engineering project
    Lin, Xiangyi
    Zhang, Qingpu
    Han, Xiaolin
    [J]. Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 891 - 894
  • [8] Integrated Project Delivery Case Study: Guidelines for Drafting Partnering Contract
    El-adaway, Islam H.
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2010, 2 (04) : 248 - 254
  • [9] Integrated Project Delivery (IPD): An Updated Review and Analysis Case Study
    Viana, Marina L.
    Hadikusumo, Bonaventura H. W.
    Mohammad, Mazlina Z.
    Kahvandi, Zahra
    [J]. Journal of Engineering, Project, and Production Management, 2020, 10 (02): : 147 - 161
  • [10] From knowledge to success: understanding the crucial role of governance, tacit knowledge sharing, and team leadership in project outcomes
    Wenquan Shi
    Yongcong Xie
    [J]. Current Psychology, 2024, 43 : 8219 - 8229