Application of smart materials technology at the Savannah River Site

被引:2
|
作者
Dunn, KA [1 ]
Louthan, MR [1 ]
Iyer, NC [1 ]
Giurgiutiu, V [1 ]
Petrou, M [1 ]
Laub, D [1 ]
机构
[1] Westinghouse Savannah River Co, Aiken, SC 29802 USA
关键词
application; bridge; design philosophy; smart materials; smart structures; smart technology; test bed;
D O I
10.1117/12.348690
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Large scale implementation of smart materials and smart technology to engineered structures in any particular location requires the demonstration of cost effective applicability to the construction, repairs/upgrades and in-service inspections required by that site. The potential for using smart materials/technology at the Savannah River Site (and within the DOE complex) can be demonstrated through the repair, upgrade and construction of two bridges. The design and construction philosophy for one of the bridges will incorporate smart materials and technologies while the other parallel bridge has already been constructed using standard construction practices. This demonstration of smart materials/technology at the Savannah River Site is still in the planning stage and will advance quickly as funding is acquired. The Savannah River Site (SRS) has an ideal test bed to test the implementation of smart materials/technology in a real but controlled setting. Two bridges were selected to serve as this test bed. Each bridge handles one way traffic on either side of a divided road. One of the bridges, 72G, was built in August of 1996, while the other 71G, was built in the 1950's and is in need of repair. The older bridge will be upgraded with advanced materials and smart technologies and then monitored for performance. After the effectiveness of the repair has been demonstrated, the repaired bridge will be demolished and replaced with a new, smart bridge. Smart technology will be used to monitor and evaluate the demolition process. The newer conventional bridge (720) may serve as a "control" structure to which the old bridge, the upgraded bridge, and the new, smart bridge may be compared. These comparisons will provide the technical basis to evaluate the use of advanced materials and smart technologies in facility upgrades and new construction at the Savannah River Site. This paper discusses the smart materials/technologies test bed at SRS and the development of an industry-university-laboratory team to support the SRS smart materials and technology demonstration.
引用
收藏
页码:64 / 75
页数:12
相关论文
共 50 条
  • [32] Soil moisture measurements and their applications at the Savannah river site
    Buckley, RL
    Parker, MJ
    Shea, D
    11TH SYMPOSIUM ON METEOROLOGICAL OBSERVATIONS AND INSTRUMENTATION, 2001, : 350 - 355
  • [33] CHEMICAL PRETREATMENT OF SAVANNAH RIVER SITE NUCLEAR WASTE
    HOBBS, DT
    WALKER, DD
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 1992, 204 : 97 - IEC
  • [34] Wildflowers of the Savannah River Site. comp.
    Anderson, Mark
    LIBRARY JOURNAL, 2016, 141 (09) : 25 - 25
  • [35] Surface wind gust statistics at the Savannah River Site
    Weber, AH
    Parker, MJ
    Weber, JH
    16TH CONFERENCE ON PROBABILITY AND STATISTICS IN THE ATMOSPHERIC SCIENCES, 2002, : 120 - 125
  • [36] A Federal case:: Research and remediation at the Savannah River site
    Kreuzer, H
    Mouché, C
    POLLUTION ENGINEERING, 2001, 33 (03) : 28 - 33
  • [37] Law enforcement tools available at the Savannah River Site
    Hofstetter, KJ
    Beals, DM
    Halverson, JE
    Villa-Aleman, E
    Hayes, DW
    JOURNAL OF RADIOANALYTICAL AND NUCLEAR CHEMISTRY, 2001, 248 (03) : 683 - 687
  • [38] Implementation of ISO14001 at the Savannah River Site
    Marra, SL
    Reeves, RD
    ENVIRONMENTAL ISSUES AND WASTE MANAGEMENT TECHNOLOGIES IN THE CERAMIC AND NUCLEAR INDUSTRIES IV, 1999, 93 : 9 - 14
  • [39] Hydrogen isotope separation experience at the Savannah River Site
    Lee, Myung W.
    Fusion Technology, 1995, 27 (2T):
  • [40] Comparing hanford and savannah river site tank wastes
    Philip Hill, R.C., 2012, American Nuclear Society, 555 North Kensington Avenue, La Grange Park, IL 60526, United States (19):