Integration of process planning and scheduling in a job shop environment

被引:37
|
作者
Kumar, M [1 ]
Rajotia, S
机构
[1] JNV Univ, Dept Prod & Ind Engn, Jodhpur 342011, Rajasthan, India
[2] JNV Univ, Dept Mech Engn, Jodhpur 342011, Rajasthan, India
关键词
computer-aided process planning; decision support system; job shop environment; production scheduling; scheduling factor;
D O I
10.1007/s00170-004-2317-y
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Today's manufacturing systems are striving for an integrated manufacturing environment. To achieve truly computer-integrated manufacturing systems (CIMS), the integration of process planning and production scheduling is essential. This paper proposes a framework for integration of process planning with production scheduling in a job shop environment for axisymmetric components. Based on the design specifications of incoming parts, feasible process plans are generated taking into account the real time shop floor status and availability of machine tools. The scheduling strategy prioritizes the machine tools based on cost considerations.
引用
收藏
页码:109 / 116
页数:8
相关论文
共 50 条
  • [41] Integrated multi-objective process planning and flexible job shop scheduling considering precedence constraints
    Shokouhi, Elahe
    [J]. PRODUCTION AND MANUFACTURING RESEARCH-AN OPEN ACCESS JOURNAL, 2018, 6 (01): : 61 - 89
  • [42] INTEGRATION OF PROCESS PLANNING AND SCHEDULING FUNCTIONS
    KHOSHNEVIS, B
    CHEN, QM
    [J]. 1989 IIE INTEGRATED SYSTEMS CONFERENCE & SOCIETY FOR INTEGRATED MANUFACTURING CONFERENCE, PROCEEDINGS, 1989, : 415 - 420
  • [43] An approach for integration of process planning and scheduling
    Phanden, Rakesh Kumar
    Jain, Ajai
    Verma, Rajiv
    [J]. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2013, 26 (04) : 284 - 302
  • [44] Integration of process planning and scheduling - a review
    Tan, W
    Khoshnevis, B
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2000, 11 (01) : 51 - 63
  • [45] INTEGRATION OF PROCESS PLANNING AND SCHEDULING FUNCTIONS
    KHOSHNEVIS, B
    CHEN, QM
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 1991, 2 (03) : 165 - 175
  • [46] Integration of process planning and scheduling— a review
    Wei Tan
    Behrokh Khoshnevis
    [J]. Journal of Intelligent Manufacturing, 2000, 11 : 51 - 63
  • [47] Job shop-Scheduling Problems- Single Process
    Mahdavinejad, Ramezan Ali
    [J]. FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE, PTS 1-4, 2011, 44-47 : 330 - 334
  • [48] Quantum algorithms for process parallel flexible job shop scheduling
    Denkena, Berend
    Schinkel, Fritz
    Pirnay, Jonathan
    Wilmsmeier, Soren
    [J]. CIRP JOURNAL OF MANUFACTURING SCIENCE AND TECHNOLOGY, 2021, 33 : 100 - 114
  • [49] Stochastic process time based job shop dynamic scheduling
    Zhang, BX
    Gong, SL
    [J]. DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES A-MATHEMATICAL ANALYSIS, 2006, 13 : 67 - 76
  • [50] Simulation as a Planning Tool for Job-Shop Production Environment
    Maram, Venkataramana
    Nawawi, Mohd Kamal Bin Mohd
    Rahman, Syariza Abdul
    Sultan, Sultan Juma
    [J]. INNOVATION AND ANALYTICS CONFERENCE AND EXHIBITION (IACE 2015), 2015, 1691