Integrated Scheduling of Rail-Mounted Gantry Cranes, Internal Trucks and Reach Stackers in Railway Operation Area of Container Terminal

被引:12
|
作者
Yan, Baicheng [1 ]
Zhu, Xiaoning [1 ]
Wang, Li [1 ]
Chang, Yimei [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Traff & Transportat, Beijing, Peoples R China
基金
中国国家自然科学基金;
关键词
CONSTRAINTS; ALGORITHM;
D O I
10.1177/0361198118782754
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this paper, the integrated scheduling of handling equipment at the railway handling area in container terminals is studied, where rail-mounted gantry cranes, internal trucks, and reach stackers are deployed. In the course of the handling operation, loading and unloading containers are handled simultaneously. The handling process is first studied and some scheduling schemes are put forward. Based on the analysis, the problem is formulated as a mixed-integer programming model, with the objectives of minimizing the makespan and the total waiting time of all equipment. Then, to solve the problem, a genetic algorithm is employed, where the first available machine rule is applied in the selection of trucks and reach stackers. Sets of numerical experiments are conducted to verify the effect of the proposed algorithm. Based on the results of experiments, some key indicators are calculated and the effects of different equipment configuration schemes are studied.
引用
收藏
页码:47 / 58
页数:12
相关论文
共 17 条
  • [1] Operations scheduling for rail mounted gantry cranes in a container terminal yard
    Bian Z.
    Li N.
    Li X.-J.
    Jin Z.-H.
    [J]. Journal of Shanghai Jiaotong University (Science), 2014, 19 (03) : 337 - 345
  • [2] Operations Scheduling for Rail Mounted Gantry Cranes in a Container Terminal Yard
    边展
    李娜
    李向军
    靳志宏
    [J]. Journal of Shanghai Jiaotong University(Science), 2014, 19 (03) : 337 - 345
  • [3] Multiobjective Scheduling for Cooperative Operation of Multiple Gantry Cranes in Railway Area of Container Terminal
    Li, Wenfeng
    Du, Shuaishuai
    Zhong, Lingchong
    He, Lijun
    [J]. IEEE ACCESS, 2022, 10 : 46772 - 46781
  • [4] An optimisation framework for yard planning in a container terminal: case with automated rail-mounted gantry cranes
    Liang Ping Ku
    Loo Hay Lee
    Ek Peng Chew
    Kok Choon Tan
    [J]. OR Spectrum, 2010, 32 : 519 - 541
  • [5] Integrated scheduling of yard cranes, external trucks, and internal trucks in maritime container terminal operation
    Gao, Yunfeng
    Ge, Ying-En
    [J]. MARITIME POLICY & MANAGEMENT, 2023, 50 (05) : 629 - 650
  • [6] An optimisation framework for yard planning in a container terminal: case with automated rail-mounted gantry cranes
    Ku, Liang Ping
    Lee, Loo Hay
    Chew, Ek Peng
    Tan, Kok Choon
    [J]. OR SPECTRUM, 2010, 32 (03) : 519 - 541
  • [7] Flexible Cooperative Scheduling Optimization of Multiple Rail Mounted Gantry Cranes in Railway Container Terminals
    Zhou Y.
    Zhang J.
    Zhong L.-C.
    Li W.-F.
    Wang G.-D.
    [J]. Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2022, 22 (01): : 133 - 141
  • [8] A Flexible Scheduling Mode of Gantry Cranes for Railway Container Terminal
    Xie, Mei
    Wang, Li
    Yang, Wanqi
    [J]. 2018 INTERNATIONAL SEMINAR ON COMPUTER SCIENCE AND ENGINEERING TECHNOLOGY (SCSET 2018), 2019, 1176
  • [9] Efficiency and energy consumption of the automated container yard with twin rail-mounted gantry cranes considering crane scheduling strategies and handshake area designs
    Tang, Guolei
    Li, Mengxin
    Fang, Zhuo
    Shen, Chen
    Qi, Yue
    Zhen, Zhonghan
    Zhao, Zhuoyao
    [J]. SIMULATION MODELLING PRACTICE AND THEORY, 2024, 135
  • [10] Integrated Scheduling of Automated Rail-Mounted Gantries and External Trucks in U-Shaped Container Terminals
    Han, Yueyi
    Zheng, Huarong
    Ma, Weihao
    Yan, Baicheng
    Ma, Dongfang
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2024,