Operations Scheduling for Rail Mounted Gantry Cranes in a Container Terminal Yard

被引:0
|
作者
边展
李娜
李向军
靳志宏
机构
[1] Transport Management College, Dalian Maritime University
[2] Information Engineering College, Dalian Ocean University
基金
中国国家自然科学基金;
关键词
rail mounted gantry cranes; operations scheduling; retrieving sequence; heuristic rules;
D O I
暂无
中图分类号
TU312.3 [];
学科分类号
081405 ;
摘要
Arranging the retrieving sequence and making the operational plans for gantry cranes to enhance port efficiency have become vital issues for the container terminals. In this paper, the problem of retrieving containers from a yard in a given sequence is discussed as an important part of the ship-loading process. This problem is divided into three categories according to its optimization complexity, i.e., the retrieval problem of a crane with a single spreader(ACSS), the retrieval problem of a crane with multiple spreaders(ACMS), and the retrieval problem of multiple cranes with a single spreader(MCSS). Firstly, heuristic algorithms are proposed to develop a retrieving sequence for ACSS to reduce the operational time. Then, optimizing the assignment to multiple spreaders is conducted by exchanging the movements of the obtained retrieving sequence. Finally, the movements are further assigned to two cranes and integrated with the MCSS retrieval problem mentioned above.The numerical experiments show the effectiveness and practicability of the heuristic algorithms.
引用
收藏
页码:337 / 345
页数:9
相关论文
共 50 条
  • [1] Operations scheduling for rail mounted gantry cranes in a container terminal yard
    Bian Z.
    Li N.
    Li X.-J.
    Jin Z.-H.
    [J]. Journal of Shanghai Jiaotong University (Science), 2014, 19 (03) : 337 - 345
  • [2] Container Terminal Yard Operations - Simulation of a Side-Loaded Container Block Served by Triple Rail Mounted Gantry Cranes
    Klaws, Jan
    Stahlbock, Robert
    Voss, Stefan
    [J]. COMPUTATIONAL LOGISTICS, 2011, 6971 : 243 - +
  • [3] An optimisation framework for yard planning in a container terminal: case with automated rail-mounted gantry cranes
    Liang Ping Ku
    Loo Hay Lee
    Ek Peng Chew
    Kok Choon Tan
    [J]. OR Spectrum, 2010, 32 : 519 - 541
  • [4] An optimisation framework for yard planning in a container terminal: case with automated rail-mounted gantry cranes
    Ku, Liang Ping
    Lee, Loo Hay
    Chew, Ek Peng
    Tan, Kok Choon
    [J]. OR SPECTRUM, 2010, 32 (03) : 519 - 541
  • [5] Multiple yard cranes scheduling for loading operations in a container terminal
    Chen, Lu
    Langevin, Andre
    [J]. ENGINEERING OPTIMIZATION, 2011, 43 (11) : 1205 - 1221
  • [6] Flexible Cooperative Scheduling Optimization of Multiple Rail Mounted Gantry Cranes in Railway Container Terminals
    Zhou Y.
    Zhang J.
    Zhong L.-C.
    Li W.-F.
    Wang G.-D.
    [J]. Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2022, 22 (01): : 133 - 141
  • [7] Integrated Scheduling of Rail-Mounted Gantry Cranes, Internal Trucks and Reach Stackers in Railway Operation Area of Container Terminal
    Yan, Baicheng
    Zhu, Xiaoning
    Wang, Li
    Chang, Yimei
    [J]. TRANSPORTATION RESEARCH RECORD, 2018, 2672 (09) : 47 - 58
  • [8] Simultaneous Allocation and Scheduling of Quay Cranes, Yard Cranes, and Trucks in Dynamical Integrated Container Terminal Operations
    Cahyono, Rully Tri
    Kenaka, Saskia Puspa
    Jayawardhana, Bayu
    [J]. IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2022, 23 (07) : 8564 - 8578
  • [9] Efficiency considerations for sequencing and scheduling of double-rail-mounted gantry cranes at maritime container terminals
    Stahlbock, R.
    Voss, S.
    [J]. INTERNATIONAL JOURNAL OF SHIPPING AND TRANSPORT LOGISTICS, 2010, 2 (01) : 95 - 123
  • [10] Flexible yard space allocation plan for new type of automated container terminal equipped with unilateral-cantilever rail-mounted gantry cranes
    Yang, Xurui
    Hu, Hongtao
    Cheng, Chen
    [J]. ADVANCED ENGINEERING INFORMATICS, 2023, 58