共 50 条
- [32] A hybrid discrete firefly algorithm for multi-objective flexible job shop scheduling problem with limited resource constraints [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 72 (9-12): : 1567 - 1579
- [34] A hybrid multi-objective genetic algorithm based on the ELECTRE method for a capacitated flexible job shop scheduling problem [J]. The International Journal of Advanced Manufacturing Technology, 2015, 77 : 51 - 66
- [35] A hybrid multi-objective genetic algorithm based on the ELECTRE method for a capacitated flexible job shop scheduling problem [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 77 (1-4): : 51 - 66
- [37] A hybrid discrete firefly algorithm for multi-objective flexible job shop scheduling problem with limited resource constraints [J]. The International Journal of Advanced Manufacturing Technology, 2014, 72 : 1567 - 1579
- [38] MULTI-OBJECTIVE FLEXIBLE JOB SHOP SCHEDULING PROBLEM WITH CARBON EMISSIONS [J]. ENERGY AND MECHANICAL ENGINEERING, 2016, : 946 - 952
- [39] Multi-objective flexible job shop scheduling problem with key objectives [J]. 2019 34RD YOUTH ACADEMIC ANNUAL CONFERENCE OF CHINESE ASSOCIATION OF AUTOMATION (YAC), 2019, : 23 - 27