Interaction between Lean Construction and the working method BIM using the example of application of visualization and modelling of the construction process

被引:0
|
作者
Berner, F. [1 ]
Hermes, M. [1 ]
Spieth, D. [2 ]
机构
[1] Univ Stuttgart, Inst Baubetriebslehre, Pfaffenwaldring 7, D-70569 Stuttgart, Germany
[2] Dietz Asset Management GmbH, Darmstadter Str 246, D-64625 Bensheim, Germany
来源
BAUINGENIEUR | 2016年 / 91卷
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the planning and execution of construction projects, two superior approaches for the holistic optimization of the construction process have been established. Using Lean Construction and Building Information Modeling (BIM) is intended to improve the whole process on a sustainable basis. Currently in Germany, the two approaches are mainly considered and applied independently. However, similarities and common aspects are existing so that a combined application seems to be useful and could lead to a holistic improvement of the construction process. For a combined application, the interfaces and similarities should be presented and examined previously. For this purpose, a research project at the Institute of Construction Management, University of Stuttgart, has been drawn up which analyzed the difficulties and examined the interfaces and synergies with regard to a combined application of the two approaches. The interfaces and synergies have been determined by an international literature analysis. In the present article, the primary results of the study "Interaction between Lean Construction and the working method BIM" are presented. In this article, the focus lies on the interfaces between Lean Construction and the two BIM applications visualization and modelling of the construction process. The findings of the interface analysis indicate that many BIM applications are consistent with the goals, tools and principles of Lean Construction. Based on this analysis, a phase model is determined which suggests a strategical application of both approaches for the entire planning and construction process. This model can serve decision-makers as a clearly arranged tool for the development of an integrated BIM-Lean process.
引用
收藏
页码:466 / 472
页数:7
相关论文
共 50 条
  • [1] A lean construction and BIM interaction model for the construction industry
    Bayhan, Hasan Gokberk
    Demirkesen, Sevilay
    Zhang, Chengyi
    Tezel, Algan
    [J]. PRODUCTION PLANNING & CONTROL, 2023, 34 (15) : 1447 - 1474
  • [2] Virtual construction method and application of building construction process based on BIM technology
    Wang Jinyu
    [J]. AGRO FOOD INDUSTRY HI-TECH, 2017, 28 (01): : 2256 - 2260
  • [3] Analysis framework for the interactions between building information modelling (BIM) and lean construction on construction mega-projects
    Evans, Martin
    Farrell, Peter
    Zewein, Wael
    Mashali, Ayman
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2021, 19 (06) : 1451 - 1471
  • [4] Investigating building information modelling (BIM) and lean construction: the potential BIM-lean interactions synergy and integration in the Jordanian construction industry
    Aburumman, Mohammad Omar
    Sweis, Rateb
    Sweis, Ghaleb J. J.
    [J]. INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2024, 15 (02) : 400 - 438
  • [5] UNDERSTANDING THE INTERACTION BETWEEN VIRTUAL DESIGN, CONSTRUCTION AND LEAN CONSTRUCTION
    Rodriguez, Maria Guadalupe Mandujano
    Cardenas, Luis Fernando Alarcon
    Dave, Bhargav A.
    Mourgues, Claudio
    Koskela, Lauri
    [J]. IGLC 2021 - 29th Annual Conference of the International Group for Lean Construction - Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC Industry Challenges, 2021, : 107 - 115
  • [6] AN EXPLORATION OF THE INTERACTION BETWEEN BIM TECHNOLOGY AND THE BUSINESS PROCESS OF A CONSTRUCTION ORGANIZATION IN BIM IMPLEMENTATION
    Chen, Bing
    Liu, Anita M. M.
    Hua, Yuanyuan
    [J]. BUILDING INFORMATION MODELLING (BIM) IN DESIGN, CONSTRUCTION AND OPERATIONS II, 2017, 169 : 177 - 189
  • [7] System Dynamics Outlook on BIM and LEAN Interaction in Construction Quantity Surveying
    Zhan, Zhaoxi
    Tang, Yutong
    Wang, Chen
    Yap, Jeffrey Boon Hui
    Lim, Yong Seng
    [J]. IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2022, 46 (05) : 3947 - 3962
  • [8] System Dynamics Outlook on BIM and LEAN Interaction in Construction Quantity Surveying
    Zhaoxi Zhan
    Yutong Tang
    Chen Wang
    Jeffrey Boon Hui Yap
    Yong Seng Lim
    [J]. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2022, 46 : 3947 - 3962
  • [9] APPLICATION OF BIM DURING LEAN CONSTRUCTION OF HIGH-RISE BUILDINGS
    Yang, Suchun
    [J]. CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2019, 28 (03): : 331 - 343
  • [10] PROCESS VISCOMETER - WORKING PRINCIPLE CONSTRUCTION AND APPLICATION
    WALTER, FJ