Identification of critical risk factors in public-private partnership project phases in developing countries A case of Nigeria

被引:25
|
作者
Babatunde, Solomon Olusola [1 ]
Perera, Srinath [2 ]
Adeniyi, Onaopepo [3 ]
机构
[1] Obafemi Awolowo Univ, Dept Quant Surveying, Ife, Nigeria
[2] Univ Western Sydney, Sch Comp Engn & Math, South Penrith, Australia
[3] Northumbria Univ, Architecture & Built Environm Dept, Newcastle Upon Tyne, Tyne & Wear, England
关键词
PPPs; Developing countries; CRITICAL SUCCESS FACTORS; INFRASTRUCTURE PROJECTS; PPP; RANKING; PERCEPTIONS; MANAGEMENT; ALLOCATION; BARRIERS;
D O I
10.1108/BIJ-01-2017-0008
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - Public-private partnerships (PPPs) are being faced by risk threats, notwithstanding the fact that the PPP model has been structured in a way that the associated risks are shared by both the public and private sectors. Consequently, the sources of risk change over the PPP project phases. Thus, the purpose of this paper is to identify and assess the risk factors in PPP infrastructure project phases comprising development phase, construction phase, operation phase and project life cycle through an empirical approach. Design/methodology/approach - The study adopted four different data-gathering approaches including literature review, desk review, brainstorming session and questionnaire survey. In order to capture a broad perception of stakeholders, the questionnaires were administered to three different stakeholder organizations to include public sector authorities (i.e. ministries, department and agencies), concessionaires and lenders/banks involved in different PPP infrastructure projects implementation in Nigeria. A total of 81 questionnaires were administered, out of which 63 were retrieved but after checking through the completed questionnaires, 60 questionnaires were found suitable for the analysis. Data collected were analyzed using descriptive statistics, mean score, Kruskal-Wallis test and the risk significance index in terms of severity and likelihood of occurrence conducted. Findings - In total, 70 risk factors were identified with respect to PPP project phases and their relative importance was gauged. In addition, the analysis of total 70 risk factors in the development phase, construction phase, operation phase and project life cycle phase indicated that 51 risk factors are located in the yellow zone, which is considered as moderate and 19 risk factors are located in the red zone that are regarded as critical. Practical implications - The identification of specific critical risk factors in each PPP project phase will provide a benchmark in developing risk management programs in developing countries. Originality/value - These study findings would be useful for PPP stakeholders to focus their attention, priorities and leadership in managing these critical risk factors. Furthermore, the findings of this study are significant in providing an in-depth understanding of the current Nigeria's PPP market environment, which is a true reflection of developing countries as a whole.
引用
收藏
页码:334 / 355
页数:22
相关论文
共 50 条
  • [21] Exploring the Critical Risk Factors of Public-Private Partnership City Hospital Projects in Turkey
    Dogan Erdem, Tugba
    Birgonul, Zeynep
    Bilgin, Gozde
    Akcay, Emre Caner
    [J]. BUILDINGS, 2024, 14 (02)
  • [22] Exploring Critical Factors for Achieving Successful Risk Allocation in Public-Private Partnership Projects
    Jin, Xiaohua
    Zuo, Jian
    Zhang, Guomin
    [J]. PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 253 - 257
  • [23] Model for predicting the success of public-private partnership infrastructure projects in developing countries: a case of Ghana
    Osei-Kyei, Robert
    Chan, Albert P. C.
    [J]. ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2019, 15 (03) : 213 - 232
  • [24] The effect of critical success factors on project success in Public-Private Partnership projects: A case study of highway projects in Iran
    Ahmadabadi, Ali Akbari
    Heravi, Gholamreza
    [J]. TRANSPORT POLICY, 2019, 73 : 152 - 161
  • [25] Public-Private Partnership Highway Projects: Identifying Project Selection Factors
    Fathi, Medya
    Shrestha, Pramen P.
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2023, 15 (01)
  • [26] Evidence on Innovation in Public-Private Partnership Project
    Liu, Lucia Xiaoyan
    Liu, Li
    [J]. PROCEEDINGS OF THE 12TH EUROPEAN CONFERENCE ON INNOVATION AND ENTREPRENEURSHIP (ECIE 2017), 2017, : 375 - 383
  • [27] Risk Allocation in US Public-Private Partnership Highway Project Contracts
    Nguyen, Duc A.
    Garvin, Michael J.
    Gonzalez, Edwin E.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (05)
  • [28] Critical success factors for public-private partnership in water supply projects
    Ameyaw, Ernest Effah
    Chan, Albert P. C.
    [J]. FACILITIES, 2016, 34 (3-4) : 124 - 160
  • [29] Assessment of the Critical Dispute Factors in Public-Private Partnership Infrastructure Projects
    Gunduz, Murat
    Naji, Khalid K.
    Al-Sharafi, Samar
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2024, 16 (04)
  • [30] A best practice framework for public-private partnership implementation for construction projects in developing countries A case of Ghana
    Osei-Kyei, Robert
    Chan, Albert P. C.
    [J]. BENCHMARKING-AN INTERNATIONAL JOURNAL, 2018, 25 (08) : 2806 - 2827