Identification of critical risk factors in public-private partnership project phases in developing countries A case of Nigeria

被引:24
|
作者
Babatunde, Solomon Olusola [1 ]
Perera, Srinath [2 ]
Adeniyi, Onaopepo [3 ]
机构
[1] Obafemi Awolowo Univ, Dept Quant Surveying, Ife, Nigeria
[2] Univ Western Sydney, Sch Comp Engn & Math, South Penrith, Australia
[3] Northumbria Univ, Architecture & Built Environm Dept, Newcastle Upon Tyne, Tyne & Wear, England
关键词
PPPs; Developing countries; CRITICAL SUCCESS FACTORS; INFRASTRUCTURE PROJECTS; PPP; RANKING; PERCEPTIONS; MANAGEMENT; ALLOCATION; BARRIERS;
D O I
10.1108/BIJ-01-2017-0008
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - Public-private partnerships (PPPs) are being faced by risk threats, notwithstanding the fact that the PPP model has been structured in a way that the associated risks are shared by both the public and private sectors. Consequently, the sources of risk change over the PPP project phases. Thus, the purpose of this paper is to identify and assess the risk factors in PPP infrastructure project phases comprising development phase, construction phase, operation phase and project life cycle through an empirical approach. Design/methodology/approach - The study adopted four different data-gathering approaches including literature review, desk review, brainstorming session and questionnaire survey. In order to capture a broad perception of stakeholders, the questionnaires were administered to three different stakeholder organizations to include public sector authorities (i.e. ministries, department and agencies), concessionaires and lenders/banks involved in different PPP infrastructure projects implementation in Nigeria. A total of 81 questionnaires were administered, out of which 63 were retrieved but after checking through the completed questionnaires, 60 questionnaires were found suitable for the analysis. Data collected were analyzed using descriptive statistics, mean score, Kruskal-Wallis test and the risk significance index in terms of severity and likelihood of occurrence conducted. Findings - In total, 70 risk factors were identified with respect to PPP project phases and their relative importance was gauged. In addition, the analysis of total 70 risk factors in the development phase, construction phase, operation phase and project life cycle phase indicated that 51 risk factors are located in the yellow zone, which is considered as moderate and 19 risk factors are located in the red zone that are regarded as critical. Practical implications - The identification of specific critical risk factors in each PPP project phase will provide a benchmark in developing risk management programs in developing countries. Originality/value - These study findings would be useful for PPP stakeholders to focus their attention, priorities and leadership in managing these critical risk factors. Furthermore, the findings of this study are significant in providing an in-depth understanding of the current Nigeria's PPP market environment, which is a true reflection of developing countries as a whole.
引用
收藏
页码:334 / 355
页数:22
相关论文
共 50 条
  • [1] Developing a Project Success Index for Public-Private Partnership Projects in Developing Countries
    Osei-Kyei, Robert
    Chan, Albert P. C.
    [J]. JOURNAL OF INFRASTRUCTURE SYSTEMS, 2017, 23 (04)
  • [2] Project-focussed literature on public-private partnership (PPP) in developing countries: a critical review
    Almeile, Ahmad Meile
    Chipulu, Maxwell
    Ojiako, Udechukwu
    Vahidi, Ramesh
    Marshall, Alasdair
    [J]. PRODUCTION PLANNING & CONTROL, 2024, 35 (07) : 683 - 710
  • [3] Identification of Critical Success and Risk Factors for Public-Private Partnership Highway Projects
    Fathi, Medya
    Shrestha, Pramen P.
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2023, 15 (01)
  • [4] Identification of critical success factors for public-private partnership projects
    Sehgal, Reetika
    Dubey, Ashish Mohan
    [J]. JOURNAL OF PUBLIC AFFAIRS, 2019, 19 (04)
  • [5] Public-Private Partnership Risk Factors in Emerging Countries: BOOT Illustrative Case Study
    Rebeiz, Karim S.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (04) : 421 - 428
  • [6] Barriers to public private partnership projects in developing countries A case of Nigeria
    Babatunde, Solomon Olusola
    Perera, Srinath
    Zhou, Lei
    Udeaja, Chika
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2015, 22 (06) : 669 - 691
  • [7] Critical success factors in public-private partnership (PPP) on infrastructure delivery in Nigeria
    Babatunde, Solomon
    Opawole, Akintayo
    Akinsiku, Olusegun
    [J]. JOURNAL OF FACILITIES MANAGEMENT, 2012, 10 (03) : 212 - +
  • [8] Stakeholder perceptions on critical success factors for public-private partnership projects in Nigeria
    Babatunde, Solomon Olusola
    Perera, Srinath
    Zhou, Lei
    Udeaja, Chika
    [J]. BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2016, 6 (01) : 74 - 91
  • [9] RISK ALLOCATION IN PUBLIC-PRIVATE PARTNERSHIP (PPP) PROJECT: A REVIEW ON RISK FACTORS
    Karim, Nur Alkaf Abd
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2011, 2 (02): : 8 - 16
  • [10] Risk Severity Matrix for Sustainable Public-Private Partnership Projects in Developing Countries
    Khahro, Shabir Hussain
    Ali, Tauha Hussain
    Hassan, Shafiqul
    Zainun, Noor Yasmin
    Javed, Yasir
    Memon, Shahbaz Aziz
    [J]. SUSTAINABILITY, 2021, 13 (06)