LEVEL OF SERVICE STANDARDS FOR STAIRWAYS IN HONG KONG UNDERGROUND STATIONS

被引:0
|
作者
Lee, Jodie Y. S. [1 ]
Lam, William H. K. [1 ]
Tam, Susanna M. L. [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Civil & Struct Engn, Hong Kong, Hong Kong, Peoples R China
关键词
D O I
暂无
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Safe pedestrian movement is essential in all cities but particularly in such densely populated cities as Hong Kong. This paper aims to investigate the levels of service (LOS) for stairways in Hong Kong Mass Transit Railway (MTR) stations. Space requirements and several qualitative factors were gleaned from the observation of pedestrian preferences and behavior. A pilot study was carried out before conducting the pedestrian preference interview survey in Hong Kong MTR station. On the basis of the survey results, six LOS design standards for stairways in Hong Kong MTR stations are proposed. The survey results are also compared with previous research findings. Lighting and clear visibility on the Hong Kong MTR stations stairways is found to be the major factor of concern with interest in the environment being of low priority. The proposed LOS standards can be used as a basis for the design and development of pedestrian stairways in both Hong Kong MTR stations and also for that in other Asian cities with similar environments.
引用
收藏
页码:317 / 326
页数:10
相关论文
共 50 条
  • [1] Levels of service for stairway in Hong Kong underground stations
    Lee, JYS
    Lam, WHK
    [J]. JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 2003, 129 (02): : 196 - 202
  • [2] Pedestrian simulation model for Hong Kong underground stations
    Lee, JYS
    Lam, WHK
    Wong, SC
    [J]. 2001 IEEE INTELLIGENT TRANSPORTATION SYSTEMS - PROCEEDINGS, 2001, : 554 - 558
  • [3] Determination of Pedestrian Level of Service for Undivided Stairways at Suburban Rail Stations in Developing Countries
    Shah, Jiten H.
    Joshi, Gaurang J.
    Parida, Purnima M.
    Arkatkar, Shriniwas S.
    [J]. TRANSPORTATION RESEARCH RECORD, 2016, (2581) : 123 - 133
  • [4] Probing Underground of Hong Kong
    不详
    [J]. BAUINGENIEUR, 2017, 92 : A12 - A12
  • [5] DESIGN AND CONSTRUCTION OF SOME UNDERGROUND STATIONS FOR THE HONG-KONG MASS TRANSIT RAILWAY SYSTEM
    BENJAMIN, AL
    ENDICOTT, LJ
    BLAKE, RJ
    STEVENS, MG
    COURT, RJ
    BENAIM, R
    NORTHGREAVES, KR
    NEW, DH
    QUINION, DW
    LUSCOMBE, RW
    SHARPE, DJ
    LEE, D
    [J]. STRUCTURAL ENGINEER-PART A, 1979, 57 (07): : 231 - 237
  • [6] DESIGN AND CONSTRUCTION OF SOME UNDERGROUND STATIONS FOR HONG-KONG MASS TRANSIT RAILWAY SYSTEM
    BENJAMIN, AL
    ENDICOTT, LJ
    BLAKE, RJ
    [J]. STRUCTURAL ENGINEER-PART A, 1978, 56 (01): : 11 - 20
  • [7] An Analysis of Capacity and Service level of the Container Terminals of Hong Kong
    Wu, Yongzhong
    Peng, Cui
    [J]. 2013 10TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM), 2013, : 404 - 409
  • [8] The use of underground space in Hong Kong
    Malone, AW
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1996, 11 (01) : 57 - 64
  • [9] Hong Kong and its underground strategy
    [J]. Wallis, Shani, 1600, (21):
  • [10] Hospice service in Hong Kong
    Lai, C
    [J]. JOURNAL OF PALLIATIVE CARE, 1998, 14 (03) : 133 - 133