共 50 条
- [1] DESIGN AND CONSTRUCTION OF SOME UNDERGROUND STATIONS FOR THE HONG-KONG MASS TRANSIT RAILWAY SYSTEM [J]. STRUCTURAL ENGINEER-PART A, 1979, 57 (07): : 231 - 237
- [2] HONG-KONG MASS TRANSIT RAILWAY MODIFIED INITIAL SYSTEM - DESIGN AND CONSTRUCTION OF UNDERGROUND STATIONS AND CUT-AND-COVER TUNNELS [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1980, 68 (NOV): : 599 - 626
- [3] PLANNING AND DESIGN OF HONG-KONG MASS TRANSIT RAILWAY [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1976, 60 (FEB): : 9 - 26
- [4] PLANNING AND DESIGN OF HONG-KONG MASS TRANSIT RAILWAY [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1976, 60 (AUG): : 535 - 545
- [5] HONG-KONG MASS TRANSIT RAILWAY MODIFIED INITIAL SYSTEM [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1982, 72 (FEB): : 87 - 98
- [6] HONG-KONG MASS TRANSIT RAILWAY MODIFIED INITIAL SYSTEM - DESIGN AND CONSTRUCTION OF THE DRIVEN TUNNELS AND THE IMMERSED TUBE [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1980, 68 (NOV): : 627 - 655
- [7] HONG-KONG MASS TRANSIT RAILWAY MODIFIED INITIAL SYSTEM - DESIGN AND CONSTRUCTION OF ABOVE-GROUND WORKS AND TRACKWORK [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1980, 68 (NOV): : 657 - 688
- [9] Asset management of the underground structure in the mass transit railway system (MTR) in Hong Kong [J]. 9th International Conference on Inspection Appraisal Repairs & Maintenance of Structures, 2005, : 425 - 434