共 50 条
- [41] Multi-objective Batch Scheduling in Collaborative Multi-product Flow Shop System by using Non-dominated Sorting Genetic Algorithm International Journal of Advanced Computer Science and Applications, 2021, 12 (09): : 349 - 357
- [42] Hybrid heuristic algorithm for multi-stage hybrid flow shop scheduling with unrelated parallel machines and finite buffers Kongzhi yu Juece/Control and Decision, 2021, 36 (03): : 565 - 576
- [44] A two-stage no-wait hybrid flow-shop model for the flight departure scheduling in a multi-airport system PROCEEDINGS OF THE 2017 IEEE 14TH INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL (ICNSC 2017), 2017, : 495 - 500
- [47] Effective Two-Phase Heuristic and Lower Bounds for Multi-Stage Flexible Flow Shop Scheduling Problem with Unloading Times SYMMETRY-BASEL, 2023, 15 (11):
- [49] A heuristic-search genetic algorithm for multi-stage hybrid flow shop scheduling with single processing machines and batch processing machines Journal of Intelligent Manufacturing, 2015, 26 : 873 - 890