Flow shop scheduling with deteriorating jobs under dominating machines

被引:71
|
作者
Wang, JB [1 ]
Xia, ZQ
机构
[1] Shenyang Inst Aeronaut Engn, Dept Sci, Shenyang 110034, Peoples R China
[2] Dalian Univ Technol, Dept Appl Math, Dalian 116024, Peoples R China
来源
关键词
scheduling; flow shop; simple linear deterioration; dominating machines;
D O I
10.1016/j.omega.2004.10.006
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper addresses no-wait or no-idle flow shop scheduling problems with deteriorating jobs, i.e., jobs whose processing times are an increasing function of their starting time. A simple linear deterioration function is assumed and some dominating relationships between machines can be satisfied. It is shown that for the problems to minimize makespan or weighted sum of completion time, polynomial algorithms still exist, although these problems are more complicated than the classical ones. When the objective is to minimize maximum lateness or maximum tardiness, the solutions of a classical version may not hold. (c) 2005 Elsevier Ltd. All rights reserved.
引用
下载
收藏
页码:327 / 336
页数:10
相关论文
共 50 条
  • [21] Parallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobs
    Mazdeh, Mohammad Mahdavi
    Zaerpour, Farzad
    Zareei, Abalfazl
    Hajinezhad, Ali
    APPLIED MATHEMATICAL MODELLING, 2010, 34 (06) : 1498 - 1510
  • [22] Synchronous flow shop scheduling with pliable jobs
    Bultmann, Matthias
    Knust, Sigrid
    Waldherr, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 270 (03) : 943 - 956
  • [23] NP-hard cases in scheduling deteriorating jobs on dedicated machines
    Kononov, A
    Gawiejnowicz, S
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (06) : 708 - 717
  • [24] Scheduling linearly deteriorating jobs on parallel machines: a simulated annealing approach
    Hindi, KS
    Mhlanga, S
    PRODUCTION PLANNING & CONTROL, 2001, 12 (01) : 76 - 80
  • [25] Two-machine Shop Scheduling with Two Agents and Linear Deteriorating Jobs
    Zhao, Xiaoli
    Wang, Gongshu
    2015 27TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2015, : 1154 - 1159
  • [26] A note on two-machine no-wait flow shop scheduling with deteriorating jobs and machine availability constraints
    Chuanli Zhao
    Hengyong Tang
    Optimization Letters, 2011, 5 : 183 - 190
  • [27] A note on two-machine no-wait flow shop scheduling with deteriorating jobs and machine availability constraints
    Zhao, Chuanli
    Tang, Hengyong
    OPTIMIZATION LETTERS, 2011, 5 (01) : 183 - 190
  • [28] Hybrid flow shop scheduling of new arrival jobs and locked jobs
    Wang, Qing
    Chen, Ying
    Huang, Min
    PROCEEDINGS OF THE 33RD CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2021), 2021, : 5169 - 5174
  • [29] MAKESPAN MINIMIZATION ON THREE-MACHINE FLOW SHOP WITH DETERIORATING JOBS
    Wang, Ji-Bo
    Wang, Ming-Zheng
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2013, 30 (06)
  • [30] A note on "minimizing makespan in three machine flow shop with deteriorating jobs"
    Jafari, Abbas-Ali
    Khademi-Zare, Hassan
    Lotfi, M. M.
    Tavakkoli-Moghaddam, Reza
    COMPUTERS & OPERATIONS RESEARCH, 2016, 72 : 93 - 96