Start-Up Evaluation of a Full-Scale Wastewater Treatment Plant Consisting of a UASB Reactor Followed by Activated Sludge

被引:3
|
作者
Diaz-Gomez, Jaime [1 ]
Perez-Vidal, Andrea [2 ]
Vargas-Nuncira, David [3 ]
Usaquen-Perilla, Olga [4 ]
Jimenez-Daza, Ximena [5 ]
Rodriguez, Claudia [6 ]
机构
[1] Univ Boyaca, Dept Sanit Engn, Res Grp Water Resources Management, Tunja 15003, Colombia
[2] Univ Santiago Cali, Fac Engn, Res Grp Microbiol Ind & Environm, Cali 760035, Colombia
[3] Univ Boyaca, Res Grp Nucleo, Tunja 15003, Colombia
[4] Univ Boyaca, Res Grp Environm Management, Tunja 15003, Colombia
[5] Univ Boyaca, Dept Sanit Engn, Tunja 15003, Colombia
[6] Veolia Tunja ESP, Tunja 15003, Colombia
关键词
anaerobic treatment; aerobic treatment; UASB; activated sludge; post-treatment; SEQUENCING BATCH REACTOR; OF-THE-ART; PERFORMANCE EVALUATION; SEWAGE-TREATMENT; DOMESTIC SEWAGE; BLANKET; SYSTEM;
D O I
10.3390/w14244034
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
UASB (upflow anaerobic sludge blanket) reactors have been recognized as a viable option for sewage treatment. However, in order to improve the UASB effluent quality, some type of post-treatment must be implemented. The aims of this study were (i) to establish a start-up methodology of a full-scale anaerobic-aerobic system treating sewage, (ii) to evaluate the concentrations of different constituents in the influent and effluent of the anaerobic and aerobic reactors as well as the removal efficiencies in every step of the system, and (iii) to define relevant operative aspects of the anaerobic and aerobic reactors. The Tunja (Colombia) wastewater treatment plant consists of three modules with preliminary treatment followed by UASB reactors with post-treatment of activated sludge. The results of this investigation showed that the effluent system meets the Colombian environmental legislation with average removal efficiency values of BOD (88 +/- 5%), COD (87 +/- 4%), and TSS (94 +/- 5%). The UASB reactor start-up was conducted without an inoculum, requiring a period of 120 days. The evaluation of the combined systems was conducted over 300 days. Moreover, a methodology to operate the system during and after the start-up of the anaerobic reactor was defined. It was demonstrated that the anaerobic effluent can deteriorate the sludge in the aerobic tank. In order to avoid this, important operational aspects must be considered during the operation of the system, such as the implementation of a raw wastewater bypass higher than 15% and monitoring of the anaerobic effluent settleable solid concentration (<0.3 mL/L).
引用
收藏
页数:19
相关论文
共 50 条
  • [41] Powdered activated carbon full-scale addition to the activated sludge reactor of a municipal wastewater treatment plant: Pharmaceutical compounds control and overall impact on the process
    Campinas, Margarida
    Viegas, Rui M. C.
    Almeida, Cristina M. M.
    Martins, Antonio
    Silva, Catarina
    Mesquita, Elsa
    Silva, Sofia
    Rosario Coelho, Maria
    Joao Benoleil, Maria
    Joao Rosa, Maria
    Cardoso, Vitor Vale
    [J]. JOURNAL OF WATER PROCESS ENGINEERING, 2022, 49
  • [42] Multivariate analysis of activated sludge community in full-scale wastewater treatment plants
    Sobczyk, Mateusz
    Pajdak-Stos, Agnieszka
    Fialkowska, Edyta
    Sobczyk, Lukasz
    Fyda, Janusz
    [J]. ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2021, 28 (03) : 3579 - 3589
  • [43] Multivariate analysis of activated sludge community in full-scale wastewater treatment plants
    Mateusz Sobczyk
    Agnieszka Pajdak-Stós
    Edyta Fiałkowska
    Łukasz Sobczyk
    Janusz Fyda
    [J]. Environmental Science and Pollution Research, 2021, 28 : 3579 - 3589
  • [44] Start-up of EGSB reactor for treatment of piggery wastewater
    Su, Caili
    Li, Haihua
    Tian, Yane
    [J]. BioTechnology: An Indian Journal, 2013, 8 (01) : 109 - 113
  • [45] Detailing the start-up and microalgal growth performance of a full-scale photobioreactor operated with bioindustrial wastewater
    Podevin, Michael
    Fotidis, Ioannis A.
    De Francisci, Davide
    Moller, Per
    Angelidaki, Irini
    [J]. ALGAL RESEARCH-BIOMASS BIOFUELS AND BIOPRODUCTS, 2017, 25 : 101 - 108
  • [46] Starting-up and operating a full-scale activated sludge system for slaughterhouse wastewater
    Liliana Pabon, Sandra
    Suraez Gelvez, John Hermogenes
    [J]. INGENIERIA E INVESTIGACION, 2009, 29 (02): : 53 - 58
  • [47] Microbial and physicochemical monitoring of granular sludge during start-up of thermophilic UASB reactor
    Ahn, Y
    Park, S
    [J]. JOURNAL OF MICROBIOLOGY AND BIOTECHNOLOGY, 2003, 13 (03) : 378 - 384
  • [48] Full-scale sludge reduction in the water line of municipal wastewater treatment plant
    Di Iaconi C.
    De Sanctis M.
    Altieri V.G.
    [J]. Journal of Environmental Management, 2020, 269
  • [49] Full-scale sludge reduction in the water line of municipal wastewater treatment plant
    Di Iaconi, Claudio
    De Sanctis, Marco
    Altieri, Valerio Guido
    [J]. JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2020, 269
  • [50] Nitrogen compounds removal by membrane filtration in water treatment plant for small communities: full-scale start-up
    Valentukeviciene, Marina
    Albrektiene, Ramune
    [J]. WATER PRACTICE AND TECHNOLOGY, 2012, 7 (01):