Start-Up Evaluation of a Full-Scale Wastewater Treatment Plant Consisting of a UASB Reactor Followed by Activated Sludge

被引:3
|
作者
Diaz-Gomez, Jaime [1 ]
Perez-Vidal, Andrea [2 ]
Vargas-Nuncira, David [3 ]
Usaquen-Perilla, Olga [4 ]
Jimenez-Daza, Ximena [5 ]
Rodriguez, Claudia [6 ]
机构
[1] Univ Boyaca, Dept Sanit Engn, Res Grp Water Resources Management, Tunja 15003, Colombia
[2] Univ Santiago Cali, Fac Engn, Res Grp Microbiol Ind & Environm, Cali 760035, Colombia
[3] Univ Boyaca, Res Grp Nucleo, Tunja 15003, Colombia
[4] Univ Boyaca, Res Grp Environm Management, Tunja 15003, Colombia
[5] Univ Boyaca, Dept Sanit Engn, Tunja 15003, Colombia
[6] Veolia Tunja ESP, Tunja 15003, Colombia
关键词
anaerobic treatment; aerobic treatment; UASB; activated sludge; post-treatment; SEQUENCING BATCH REACTOR; OF-THE-ART; PERFORMANCE EVALUATION; SEWAGE-TREATMENT; DOMESTIC SEWAGE; BLANKET; SYSTEM;
D O I
10.3390/w14244034
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
UASB (upflow anaerobic sludge blanket) reactors have been recognized as a viable option for sewage treatment. However, in order to improve the UASB effluent quality, some type of post-treatment must be implemented. The aims of this study were (i) to establish a start-up methodology of a full-scale anaerobic-aerobic system treating sewage, (ii) to evaluate the concentrations of different constituents in the influent and effluent of the anaerobic and aerobic reactors as well as the removal efficiencies in every step of the system, and (iii) to define relevant operative aspects of the anaerobic and aerobic reactors. The Tunja (Colombia) wastewater treatment plant consists of three modules with preliminary treatment followed by UASB reactors with post-treatment of activated sludge. The results of this investigation showed that the effluent system meets the Colombian environmental legislation with average removal efficiency values of BOD (88 +/- 5%), COD (87 +/- 4%), and TSS (94 +/- 5%). The UASB reactor start-up was conducted without an inoculum, requiring a period of 120 days. The evaluation of the combined systems was conducted over 300 days. Moreover, a methodology to operate the system during and after the start-up of the anaerobic reactor was defined. It was demonstrated that the anaerobic effluent can deteriorate the sludge in the aerobic tank. In order to avoid this, important operational aspects must be considered during the operation of the system, such as the implementation of a raw wastewater bypass higher than 15% and monitoring of the anaerobic effluent settleable solid concentration (<0.3 mL/L).
引用
收藏
页数:19
相关论文
共 50 条
  • [1] Start-up and steady-state results of a full-scale UASB reactor treating malting wastewater
    Borzacconi, L.
    Lopez, I.
    Passeggi, M.
    [J]. WATER SCIENCE AND TECHNOLOGY, 2006, 54 (02) : 261 - 267
  • [3] Start-up strategies of UASB reactor for treatment of pharmaceutical wastewater
    Zheng, P
    Hu, BL
    [J]. JOURNAL OF ENVIRONMENTAL SCIENCES, 2002, 14 (02) : 250 - 254
  • [4] Start-up of a UASB effluent treatment plant on distillery wastewater
    Wolmarans, B
    de Villiers, GH
    [J]. WATER SA, 2002, 28 (01) : 63 - 68
  • [5] ACCLIMATIZATION OF ANAEROBIC SLUDGE FOR UASB REACTOR START-UP
    DEZEEUW, WJ
    [J]. NETHERLANDS JOURNAL OF AGRICULTURAL SCIENCE, 1985, 33 (01): : 81 - 84
  • [6] Nitrogen-removal from sludge water with SBR process:: start-up of a full-scale plant in the municipal wastewater treatment plant at Ingolstadt, Germany
    Vallés-Morales, MJ
    Mendoza-Roca, JA
    Bes-Pia, A
    Iborra-Clar, A
    [J]. WATER SCIENCE AND TECHNOLOGY, 2004, 50 (10) : 51 - 58
  • [7] DEVELOPMENT OF THE MICROBIAL COMMUNITY OF A FULL-SCALE BIOLOGICAL NUTRIENT REMOVAL ACTIVATED-SLUDGE PLANT DURING START-UP
    KNIGHT, GC
    SEVIOUR, EM
    SEVIOUR, RJ
    SODDELL, JA
    LINDREA, KC
    STRACHAN, W
    DEGREY, B
    BAYLY, RC
    [J]. WATER RESEARCH, 1995, 29 (09) : 2085 - 2093
  • [8] Calibration of a complex activated sludge model for the full-scale wastewater treatment plant
    Ewa Liwarska-Bizukojc
    Dorota Olejnik
    Rafal Biernacki
    Stanislaw Ledakowicz
    [J]. Bioprocess and Biosystems Engineering, 2011, 34 : 659 - 670
  • [9] Calibration of a complex activated sludge model for the full-scale wastewater treatment plant
    Liwarska-Bizukojc, Ewa
    Olejnik, Dorota
    Biernacki, Rafal
    Ledakowicz, Stanislaw
    [J]. BIOPROCESS AND BIOSYSTEMS ENGINEERING, 2011, 34 (06) : 659 - 670
  • [10] A new method of biological start-up in Arak activated sludge wastewater treatment plant
    Khalili, Abdolreza
    Mohebi, Mohammad Reza
    Mohebi, Mohammad
    Ashouri, Farideh
    [J]. WATER PRACTICE AND TECHNOLOGY, 2013, 8 (02): : 234 - 243