Boiler-turbine dynamics in power-plant control

被引:78
|
作者
Maffezzoni, C
机构
[1] Dip. Elettronica e Informazione, Politecnico di Milano, P.zza L. da Vinci, 32, Milano
关键词
boilers; control-oriented models; conventional control; power station control; process models; steam plants;
D O I
10.1016/S0967-0661(97)00007-5
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Fossil-fired power plants are generally equipped with complex control systems, the structure of which reflects the relevant process dynamics underlying the steam-generation process. This paper highlights the principal dynamic phenomena which determine the structuring of boiler-turbine control systems, clarifying the essential connections of such phenomena with the physical nature of the process. In this way, it also describes how to capture basic boiler dynamics by simple first-principle models, specifying the limits of their use for control design. Copyright (C) 1997 Elsevier Science Ltd.
引用
收藏
页码:301 / 312
页数:12
相关论文
共 50 条
  • [1] Boiler-turbine coordinated control of power plant based on the adaptive backstepping method
    Wang Yinsong
    Tian Ruili
    Lui Lixia
    [J]. PROCEEDINGS OF THE 26TH CHINESE CONTROL CONFERENCE, VOL 2, 2007, : 279 - +
  • [2] Design and Implementation of Extended Predictive Functional Control for Boiler-Turbine Unit of Power Plant
    Farahani, Maryam Amirabadi
    Haeri, Mohammad
    [J]. 2016 24TH MEDITERRANEAN CONFERENCE ON CONTROL AND AUTOMATION (MED), 2016, : 131 - 134
  • [3] BOILER-TURBINE COMPUTER CONTROL AT FAWLEY POWER-STATION
    OSBORN, JH
    TESSON, AR
    WRIGHT, W
    ALEXANDE.CE
    [J]. IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1973, PA92 (06): : 1813 - 1813
  • [4] Multivariable Identification for Boiler-Turbine Control System of Power Unit
    Wang Ya-gang
    Wang Xian-ping
    Zhang Xi
    Li Xiao-feng
    [J]. 2013 32ND CHINESE CONTROL CONFERENCE (CCC), 2013, : 1748 - 1752
  • [5] A new coordinated control strategy for boiler-turbine system of coal-fired power plant
    Li, SY
    Liu, HB
    Cai, WJ
    Soh, YC
    Xie, LH
    [J]. IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2005, 13 (06) : 943 - 954
  • [6] Nonlinear dynamics and control of bifurcation to regulate the performance of a boiler-turbine unit
    Moradi, Hamed
    Alasty, Aria
    Vossoughi, Gholamreza
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2013, 68 : 105 - 113
  • [7] Long Range Predictive PID Control for Nonlinear Boiler-Turbine Dynamics
    Hoshmandi, Kaveh
    Montazeri, Mohsen
    [J]. 2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY, VOLS 1-3, 2009, : 66 - 71
  • [8] Fault detection and isolation system for boiler-turbine unit of a thermal power plant
    Madrigal-Espinosa, G.
    Osorio-Gordillo, G. -L.
    Astorga-Zaragoza, C. -M.
    Vazquez-Roman, M.
    Adam-Medina, M.
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2017, 148 : 237 - 244
  • [9] Finite Time Control of A Boiler-turbine System
    Lin, Xiangze
    Zhou, Xuan
    Ding, Yongqian
    Li, Shihua
    Shen, Mingxia
    [J]. CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 2390 - +
  • [10] Advanced Control Design for Boiler-Turbine Unit
    Chan, Kwong Ho
    Ydstie, B. Erik
    Cheng, Xu
    [J]. 2011 IEEE INTERNATIONAL CONFERENCE ON CONTROL APPLICATIONS (CCA), 2011, : 864 - 870