共 50 条
- [31] KNOWLEDGE MANAGEMENT PERFORMANCE EVALUATION SYSTEM OF R&D PROJECT BASED ON AHP METHOD [J]. 4TH INTERNATIONAL CONFERENCE ON ADVANCED COMPUTER THEORY AND ENGINEERING ( ICACTE 2011), 2011, : 659 - 662
- [33] Risk Assessment of Electric Power Construction Project Based on AHP and the Fuzzy Comprehensive Evaluation [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 695 - 702
- [34] Risk Evaluation of Venture Investment Project Based on the Rough Set Theory and AHP Method [J]. PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 1985 - 1990
- [35] An evaluation model of knowledge capital in construction supply chain based on fuzzy AHP [J]. Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 1167 - 1171
- [36] The evaluation of knowledge management performance based on AHP [J]. PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON PRODUCT INNOVATION MANAGEMENT & THE 3RD INTERNATIONAL CONFERENCE ON VALUE ENGINEERING, 2007, : 70 - 76
- [37] The model research of the knowledge transfer and sharing in the ERP implement [J]. GLOBALIZATION CHALLENGE AND MANAGEMENT TRANSFORMATION, VOLS I - III, 2007, : 532 - 538
- [38] The evaluation of knowledge management performance based on AHP [J]. GLOBALIZATION CHALLENGE AND MANAGEMENT TRANSFORMATION, VOLS I - III, 2007, : 517 - 522