Maximising the net social benefit of the construction of post-disaster alternative housing projects

被引:8
|
作者
El-Anwar, Omar [1 ]
机构
[1] Univ Washington, Dept Construct Management, Seattle, WA 98195 USA
关键词
Alternative Housing Pilot Programs; optimisation; socioeconomic benefit; temporary housing; DISASTERS;
D O I
10.1111/disa.12000
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The widespread destruction that follows large-scale natural disasters, such as Hurricane Katrina in August 2005, challenges the efficacy of traditional temporary housing methods in providing adequate solutions to housing needs. Recognising these housing challenges, the Congress of the United States allocated, in 2006, USD 400 million to the Department of Homeland Security to support Alternative Housing Pilot Programs, which are intended to explore the possibilities of providing permanent and affordable housing to displaced families instead of traditional temporary housing. This paper presents a new methodology and optimisation model to identify the optimal configurations of post-shelter housing arrangements to maximise the overall net socioeconomic benefit. The model is capable of quantifying and optimising the impacts of substituting temporary housing with alternative housing on the social and economic welfare of displaced families as well as the required additional costs of doing so. An application example is presented to illustrate the use of the model and its capabilities.
引用
收藏
页码:489 / 515
页数:27
相关论文
共 50 条
  • [1] The role of spontaneous construction for post-disaster housing
    Felix, D.
    Feio, A.
    Branco, J. M.
    Machado, Jose S.
    [J]. STRUCTURES AND ARCHITECTURE: CONCEPTS: APPLICATIONS AND CHALLENGES, 2013, : 937 - 944
  • [2] A systems view of temporary housing projects in post-disaster reconstruction
    Johnson, Cassidy
    Lizarralde, Gonzalo
    Davidson, Colin H.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (04) : 367 - 378
  • [3] Truths and myths about community participation in post-disaster housing projects
    Davidson, Colin H.
    Johnson, Cassidy
    Lizarralde, Gonzalo
    Dikmen, Nese
    Sliwinski, Alicia
    [J]. HABITAT INTERNATIONAL, 2007, 31 (01) : 100 - 115
  • [4] The Evaluation of Community Participation in Post-Disaster Housing Reconstruction Projects in Malaysia
    Roosli, Ruhizal
    Nordin, Jestin
    O'Brien, Geoff
    [J]. 7TH INTERNATIONAL CONFERENCE ON BUILDING RESILIENCE: USING SCIENTIFIC KNOWLEDGE TO INFORM POLICY AND PRACTICE IN DISASTER RISK REDUCTION, 2018, 212 : 667 - 674
  • [5] POST-DISASTER HOUSING: A COMPLEX SYSTEMS APPROACH TO SOCIAL RESILIENCE
    Elinwa, Ugochukwu K.
    Moyo, Nothando
    [J]. OPEN HOUSE INTERNATIONAL, 2018, 43 (04) : 31 - 40
  • [6] Post-Disaster Housing Recovery: The Promise and Peril of Social Capital
    Mukherji, Anuradha
    [J]. JOURNAL OF CIVIL SOCIETY, 2014, 10 (02) : 119 - 143
  • [7] Advantages and limitations of community-based post-disaster housing reconstruction projects
    Ophiyandri, Taufika
    Amaratunga, Dilanthi
    Keraminiyage, Kaushal
    [J]. INTERNATIONAL JOURNAL OF DISASTER RESILIENCE IN THE BUILT ENVIRONMENT, 2016, 7 (04) : 420 - 431
  • [8] A framework for community participation in post-disaster housing reconstruction projects: A case of Afghanistan
    Sadiqi, Zabihullah
    Trigunarsyah, Bambang
    Coffey, Vaughan
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (05) : 900 - 912
  • [9] Strategic planning for post-disaster temporary housing
    Johnson, Cassidy
    [J]. DISASTERS, 2007, 31 (04) : 435 - 458