NUMERICAL ANALYSIS OF EXCAVATION METHOD FOR A SUBWAY UNDERMINE STATION PILOT TUNNEL IN BEIJING

被引:0
|
作者
Xie, Jinshui [1 ]
Bai, Mingzhou [1 ]
Kuang, Xing [1 ]
Du, Yanqing [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Civil Engn, Beijing 100044, Peoples R China
关键词
Beijing subway; undermine; construction method; numerical analysis;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Combined with the geological conditions and the project's features of Beijing subway station, in order to solve the selection problem of pilot tunnel's construction method in undermining the station, directing at the commonly used method-CD method, CRD method and double side wall pilot tunnel method, we can adopt FLAC3D numerical calculation method in controlling its surface deformation effect and supporting structure hand features to make analysis and prediction, then we can conclude the surface settlement's size and law and analyse the feasibility of these methods in this section and the differences of various method, make effective election of these methods by comparation.
引用
收藏
页码:607 / 614
页数:8
相关论文
共 50 条
  • [41] Analysis of the interaction between subway tunnel and superstructure during excavation and the control measure
    Civil Engineering and Mechanics, Central South University of Forestry and Technology, Changsha
    410004, China
    不详
    410004, China
    [J]. Electron. J. Geotech. Eng, 26 (10299-10310):
  • [42] Optimization Study of Subway Station Underground Excavation Construction Method Based on Fuzzy Theory
    Geng, Dongyang
    Yu, Xiangmei
    Cao, Lijun
    [J]. CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1015 - 1019
  • [43] Investigation of tunnel excavation numerical analysis method for the combined finite-discrete element method
    Li, Peitao
    Liu, Quansheng
    [J]. ENGINEERING ANALYSIS WITH BOUNDARY ELEMENTS, 2024, 165
  • [44] Study on Excavation Sequence of Pilot Tunnels for a Rectangular Tunnel Using Numerical Simulation and Field Monitoring Method
    Shuobiao Li
    Yonggang Zhang
    Mingyang Cao
    Zenian Wang
    [J]. Rock Mechanics and Rock Engineering, 2022, 55 : 3507 - 3523
  • [45] Study on Excavation Sequence of Pilot Tunnels for a Rectangular Tunnel Using Numerical Simulation and Field Monitoring Method
    Li, Shuobiao
    Zhang, Yonggang
    Cao, Mingyang
    Wang, Zenian
    [J]. ROCK MECHANICS AND ROCK ENGINEERING, 2022, 55 (06) : 3507 - 3523
  • [46] Numerical Analysis of the Effect of River Channel Excavation on Existing Subway Tunnels
    Wang, Hai-ming
    Yu, Xiao
    Xing, Bang-ning
    Wang, Hao
    Su, Jie
    Zhang, Hua-jun
    Sun, Fa-xiang
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2024, 42 (05) : 4225 - 4244
  • [47] The Numerical Simulation Analysis of Excavation Process of Loess Tunnel
    Guo Jian
    Wang Qi-Cai
    [J]. MANUFACTURING SCIENCE AND TECHNOLOGY, PTS 1-8, 2012, 383-390 : 6594 - 6600
  • [48] Numerical and experimental study on optimal running mode of smoke extraction system in a subway station in Beijing
    Yang, Yingxia
    Chen, Chao
    Fan, Hongming
    Qu, Lu
    Ren, Mingliang
    [J]. BUILDING SIMULATION 2007, VOLS 1-3, PROCEEDINGS, 2007, : 1254 - 1261
  • [49] Numerical analysis of landslide behavior induced by tunnel excavation
    Koizumi, Y.
    Lee, J.
    Date, K.
    Yokota, Y.
    Yamamoto, T.
    Fujisawa, K.
    [J]. ROCK MECHANICS IN CIVIL AND ENVIRONMENTAL ENGINEERING, 2010, : 555 - 558
  • [50] Evaluation of mountain tunnel excavation method by means of 3D-numerical analysis
    Shinji, M
    Junica, MI
    Nakagawa, K
    Takahashi, H
    Murata, Y
    [J]. (RE)CLAIMING THE UNDERGROUND SPACE, VOLS 1 AND 2, PROCEEDINGS, 2003, : 521 - 528