EVALUATION OF RENEWABLE ENERGY ALTERNATIVES USING MACBETH AND FUZZY AHP MULTICRITERIA METHODS: THE CASE OF TURKEY

被引:102
|
作者
Ertay, Tijen [1 ]
Kahraman, Cengiz [1 ]
Kaya, Ihsan [2 ]
机构
[1] Istanbul Tech Univ, Dept Management Engn, TR-34367 Istanbul, Turkey
[2] Yildiz Tech Univ, Dept Ind Engn, TR-34349 Istanbul, Turkey
关键词
multi criteria decision making; MACBETH software; AHP; fuzzy; renewable energy alternatives; linguistic terms; DECISION-MAKING; SELECTION; LOGIC; MODEL;
D O I
10.3846/20294913.2012.762950
中图分类号
F [经济];
学科分类号
02 ;
摘要
Energy is a critical foundation for economic growth and social progress. It is estimated that 70% of the world energy consumption could be provided from renewable resources by the year 2050. Renewable energy is the inevitable choice for sustainable economic growth, for the harmonious coexistence of human and environment as well as for the sustainable development. The aim of this paper is to evaluate the renewable energy alternatives as a key way for resolving the Turkey's energy-related challenges because of the fact that Turkey's energy consumption has risen dramatically over the past three decades as a consequence of economic and social development. In order to realize this aim, we comparatively use MACBETH and AHP-based multicriteria methods for the evaluation of renewable energy alternatives under fuzziness. We use 4 main attributes and 15 sub-attributes in the evaluation. The potential renewable energy alternatives in Turkey are determined as Solar, Wind, Hydropower, and Geothermal.
引用
收藏
页码:38 / 62
页数:25
相关论文
共 50 条
  • [1] EVALUATION OF RENEWABLE ENERGY ALTERNATIVES USING MACBETH MULTICRITERIA METHOD
    Ertay, Tijen
    Kahraman, Cengiz
    [J]. COMPUTATIONAL INTELLIGENCE: FOUNDATIONS AND APPLICATIONS: PROCEEDINGS OF THE 9TH INTERNATIONAL FLINS CONFERENCE, 2010, 4 : 937 - +
  • [2] Multicriteria renewable energy planning using an integrated fuzzy VIKOR & AHP methodology: The case of Istanbul
    Kaya, Tolga
    Kahraman, Cengiz
    [J]. ENERGY, 2010, 35 (06) : 2517 - 2527
  • [3] The evaluation of renewable energy alternatives in Turkey using intuitionistic-fuzzy EDAS methodology
    Cüneyt Dumrul
    Faik Bilgili
    Fulya Zarali
    Yasemin Dumrul
    Zerrin Kiliçarslan
    [J]. Environmental Science and Pollution Research, 2024, 31 : 15503 - 15524
  • [4] The evaluation of renewable energy alternatives in Turkey using intuitionistic-fuzzy EDAS methodology
    Dumrul, Cueneyt
    Bilgili, Faik
    Zarali, Fulya
    Dumrul, Yasemin
    Kilicarslan, Zerrin
    [J]. ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2024, 31 (10) : 15503 - 15524
  • [5] Selection among Renewable Energy Alternatives Using Fuzzy Axiomatic Design: The Case of Turkey
    Kahraman, Cengiz
    Cebi, Selcuk
    Kaya, Ihsan
    [J]. JOURNAL OF UNIVERSAL COMPUTER SCIENCE, 2010, 16 (01) : 82 - 102
  • [6] ENERGY ALTERNATIVES EVALUATION IN TURKEY BY USING MULTICRITERIA DECISION MAKING METHODOLOGIES
    Alcan, Pelin
    Odabasi, Didem
    Balin, Abit
    [J]. UNCERTAINTY MODELLING IN KNOWLEDGE ENGINEERING AND DECISION MAKING, 2016, 10 : 627 - 631
  • [7] The evaluation of renewable energy alternatives for sustainable development in Turkey using intuitionistic fuzzy-TOPSIS method
    Bilgili, Faik
    Zarali, Fulya
    Ilgun, Mirac Fatih
    Dumrul, Cuneyt
    Dumrul, Yasemin
    [J]. RENEWABLE ENERGY, 2022, 189 : 1443 - 1458
  • [8] Prioritization of renewable energy alternatives by using an integrated fuzzy MCDM model: A real case application for Turkey
    Colak, Murat
    Kaya, Ihsan
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2017, 80 : 840 - 853
  • [9] Multicriteria renewable energy planning using an integrated fuzzy VIKOR & AHP methodology: The case of Istanbul (vol 35, pg 2517, 2010)
    Saeedpoor, Mandi
    Vafadarnikjoo, Amin
    [J]. ENERGY, 2015, 79 : 536 - 537
  • [10] THE APPLICATIONS OF ENERGY ALTERNATIVES IN TURKEY USING MULTICRITERIA DECISION MAKING PROCESSES
    Balin, Abit
    Alcan, Pelin
    Basligil, Huseyin
    [J]. UNCERTAINTY MODELING IN KNOWLEDGE ENGINEERING AND DECISION MAKING, 2012, 7 : 124 - 130