共 50 条
- [34] Design and installation of a sand-separation and -handling system for a gulf of Mexico oil production facility [J]. SPE PRODUCTION & FACILITIES, 2001, 16 (03): : 134 - 140
- [36] The first coiled-tubing-deployed ESP in the Gulf of Mexico [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 2004, 56 (06): : 52 - 53
- [38] The first coiled-tubing-deployed ESP in the Gulf of Mexico [J]. JPT, Journal of Petroleum Technology, 2004, 56 (06): : 52 - 53
- [40] ONE STEP INSTALLATION OF A TLP SUBSTRUCTURE - REQUIREMENTS, ASSUMPTIONS, ISSUES [J]. PROCEEDINGS OF THE ASME 36TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2017, VOL 10, 2017,