Two-machine job shop problem under availability constraints on one machine: Makespan minimization

被引:11
|
作者
Benttaleb, Mourad [1 ]
Hnaien, Faicel [1 ]
Yalaoui, Farouk [1 ]
机构
[1] Univ Technol Troyes, CNRS, ICD, LOSI,UMR 6281, 12 Rue Marie Curie,CS 42060, F-10004 Troyes, France
关键词
Scheduling problem; Job shop; Availability constraint; Makespan; Mixed integer linear programming; Branch-and-bound; SCHEDULING PROBLEM; SINGLE-MACHINE; FLOWSHOP;
D O I
10.1016/j.cie.2018.01.028
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper considers a two-machine job shop scheduling problem with availability constraints on one machine in order to minimize makespan. We consider the problem when unavailability periods are known in advance and operations are non-preemptive. First, two mixed integer linear programming models MILP1, MILP2 are presented. Secondly, we introduce some properties concerning the optimality of Jackson's algorithm under availability constraints. Consequently, new lower bounds are provided and an upper bound is obtained using heuristics based on Jackson's rule. Then, a branch and bound algorithm (B&B) incorporating these bounds is proposed to solve the problem. The performances of the proposed approaches are evaluated by comparing their solutions through well known benchmarks. Computational results prove the efficiency of the proposed B&B.
引用
收藏
页码:138 / 151
页数:14
相关论文
共 50 条
  • [41] Two-machine open shop scheduling with an availability constraint
    Breit, J
    Schmidt, G
    Strusevich, VA
    OPERATIONS RESEARCH LETTERS, 2001, 29 (02) : 65 - 77
  • [42] Two-machine shop scheduling: Compromise between flexibility and makespan value
    Esswein, C
    Billaut, JC
    Strusevich, VA
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 167 (03) : 796 - 809
  • [43] Minimizing makespan in a two-machine flow shop with effects of deterioration and learning
    Wang, Ji-Bo
    Ji, P.
    Cheng, T. C. E.
    Wang, Dan
    OPTIMIZATION LETTERS, 2012, 6 (07) : 1393 - 1409
  • [44] Parallel machine makespan minimization subject to machine availability and total completion time constraints
    Huo, Yumei
    JOURNAL OF SCHEDULING, 2019, 22 (04) : 433 - 447
  • [45] A Genetic Algorithm to Minimize the Makespan in a Two-Machine Cross-Docking Flow Shop Problem
    Imen Hamdi
    Mohamed Fadhel Tekaya
    Journal of the Operations Research Society of China, 2020, 8 : 457 - 476
  • [46] Two-machine open-shop scheduling with rejection to minimize the makespan
    Liqi Zhang
    Lingfa Lu
    Jinjiang Yuan
    OR Spectrum, 2016, 38 : 519 - 529
  • [47] Parallel machine makespan minimization subject to machine availability and total completion time constraints
    Yumei Huo
    Journal of Scheduling, 2019, 22 : 433 - 447
  • [48] A Genetic Algorithm to Minimize the Makespan in a Two-Machine Cross-Docking Flow Shop Problem
    Hamdi, Imen
    Tekaya, Mohamed Fadhel
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF CHINA, 2020, 8 (03) : 457 - 476
  • [49] Two-machine open-shop scheduling with rejection to minimize the makespan
    Zhang, Liqi
    Lu, Lingfa
    Yuan, Jinjiang
    OR SPECTRUM, 2016, 38 (02) : 519 - 529
  • [50] Two-machine, no-wait job shop problem with separable setup times and single-server constraints
    Samarghandi, Hamed
    ElMekkawy, Tarek Y.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 65 (1-4): : 295 - 308