Ex ante heuristic measures of schedule reliability

被引:68
|
作者
Carey, M [1 ]
机构
[1] Univ Ulster, Fac Business & Management, Newtonabbey BT37 0QB, Antrim, North Ireland
基金
英国工程与自然科学研究理事会;
关键词
reliability measures; transport planning; trains;
D O I
10.1016/S0191-2615(99)00002-8
中图分类号
F [经济];
学科分类号
02 ;
摘要
Measures of reliability and punctuality of scheduled public transport services are important in planning, management, operating and marketing of these services. Various methods can be used to measure reliability. Analytic methods are usually practical for only very simple structured systems. Simulation methods are very time consuming and require data which may not be available. As a result, the most widely used measures are ad hoc or heuristic. However, the assumptions and properties of these measures, and the relationships between them, are seldom discussed, hence we discuss them here. We consider existing measures, extensions of these, and new measures. For specificity, we use the example of train arrivals and departures at a train station: stations with several hundred trains per day and multiple platforms are common in many countries, for example throughout Europe. Some measures of reliability are based on the observed delays, hence can be used only after the event. However, we here focus on measures which can be used in advance, for example for estimating the reliability of proposed schedules or changes in schedules at the design stage. In this we distinguish between measures which require some information about probabilities of delay and those which do not. We also distinguish between exogenous delays, which are beyond the influence of the scheduler (delays due to problems in engineering or operations), and knock-on delays which are affected by schedule design: both types are of interest for schedule reliability, but the latter are of more interest for measuring schedule robustness. (C) 1999 Published by Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:473 / 494
页数:22
相关论文
共 50 条
  • [31] The relative performance of ex-ante and ex-post measures to mitigate hypothetical and strategic bias in a stated preference study
    Colombo, Sergio
    Budzinski, Wiktor
    Czajkowski, Mikolaj
    Glenk, Klaus
    JOURNAL OF AGRICULTURAL ECONOMICS, 2022, 73 (03) : 845 - 873
  • [32] Ex ante research explored: numbers, types and use of ex ante policy studies by the Dutch government
    Haarhuis, Carolien Maria Klein
    Smit, Monika
    EVIDENCE & POLICY, 2017, 13 (04): : 647 - 668
  • [33] EX ANTE VALUATION OF ATMOSPHERIC VISIBILITY
    CROCKER, TD
    SHOGREN, JF
    APPLIED ECONOMICS, 1991, 23 (1B) : 143 - 151
  • [34] Ex Ante Tourism Forecasting Assessment
    Liu, Anyu
    Lin, Vera Shanshan
    Li, Gang
    Song, Haiyan
    JOURNAL OF TRAVEL RESEARCH, 2022, 61 (01) : 64 - 75
  • [35] Contracts, necessity and ex ante optimality
    Esposto A.G.
    European Journal of Law and Economics, 2000, 9 (2) : 145 - 156
  • [36] THE INFORMATIONAL CONTENT OF EX ANTE FORECASTS
    FAIR, RC
    SHILLER, RJ
    REVIEW OF ECONOMICS AND STATISTICS, 1989, 71 (02) : 325 - 331
  • [37] Spin-offs, ex ante
    McConnell, JJ
    Ozbilgin, M
    Wahal, S
    JOURNAL OF BUSINESS, 2001, 74 (02): : 245 - 280
  • [38] Ex ante transparency and corruption by networks
    Bac, Mehmet
    ECONOMICA, 2024, 91 (363) : 1023 - 1046
  • [39] EX ANTE EQUITY IN PUBLIC RISK
    SOUNDERPANDIAN, J
    OPERATIONS RESEARCH, 1989, 37 (04) : 528 - 530
  • [40] Are 'ex ante' enhancements always permissible?
    Liao, SM
    AMERICAN JOURNAL OF BIOETHICS, 2005, 5 (03): : 23 - 25