Modelling and optimisation of energy-efficient U-shaped robotic assembly line balancing problems

被引:58
|
作者
Zhang, Zikai [1 ,2 ]
Tang, Qiuhua [1 ,2 ]
Li, Zixiang [1 ,2 ]
Zhang, Liping [1 ,2 ]
机构
[1] Wuhan Univ Sci & Technol, Key Lab Met Equipment & Control Technol, Wuhan, Hubei, Peoples R China
[2] Wuhan Univ Sci & Technol, Hubei Key Lab Mech Transmiss & Mfg Engn, Wuhan, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
U-shaped robotic assembly lines; assembly line balancing; energy consumption reduction; artificial bee colony; multi-objective optimisation; SIMULATED ANNEALING ALGORITHM; GENETIC ALGORITHM; PROGRAMMING FORMULATION; HEURISTIC APPROACH; TIME;
D O I
10.1080/00207543.2018.1530479
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Within U-shaped assembly lines, the increase of labour costs and subsequent utilisation of robots has led to growing energy consumption, which is the current main expense of auto and electronics industries. However, there are limited researches concerning both energy consumption reduction and productivity improvement on U-shaped robotic assembly lines. This paper first develops a nonlinear multi-objective mixed-integer programming model, reformulates it into a linear form by linearising the multiplication of two binary variables, and then refines the weight of multiple objectives so as to achieve a better approximation of true Pareto frontiers. In addition, Pareto artificial bee colony algorithm (PABC) is extended to tackle this new complex problem. This algorithm stores all the non-dominated solutions into a permanent archive set to keep all the good genes, and selects one solution from this set to overcome the strong local minima. Comparative experiments based on a set of newly generated benchmarks verify the superiority of the proposed PABC over four multi-objective algorithms in terms of generation distance, maximum spread, hypervolume ratio and the ratio of non-dominated solution.
引用
收藏
页码:5520 / 5537
页数:18
相关论文
共 50 条
  • [31] Ant algorithm for U-shaped line balancing problem
    Department of Mechanical Engineering, Andhra University, Visakhapatnam 530 003, India
    J Inst Eng India Part PR, 2007, MAR. (9-13):
  • [32] An efficient approach for type II robotic assembly line balancing problems
    Gao, Jie
    Sun, Linyan
    Wang, Lihua
    Gen, Mitsuo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (03) : 1065 - 1080
  • [33] THE IMPACT OF WALKING TIME ON U-SHAPED ASSEMBLY LINE WORKER ALLOCATION PROBLEMS
    Sirovetnukul, Ronnachai
    Chutima, Parames
    ENGINEERING JOURNAL-THAILAND, 2010, 14 (02): : 53 - 78
  • [34] Bound-guided hybrid estimation of distribution algorithm for energy-efficient robotic assembly line balancing
    Sun, Bin-qi
    Wang, Ling
    Peng, Zhi-ping
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 146
  • [35] Note. Optimal balancing of U-shaped assembly lines
    Urban, TL
    MANAGEMENT SCIENCE, 1998, 44 (05) : 738 - 741
  • [36] Heuristic for balancing U-shaped assembly lines with parallel stations
    Chen, Sihua
    Plebani, Louis
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 2008, 51 (01) : 1 - 14
  • [37] ULINO: Optimally balancing U-shaped JIT assembly lines
    Scholl, A
    Klein, R
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (04) : 721 - 736
  • [38] A branch and bound method for the line balancing problem in U-shaped assembly lines with equipment requirements
    Ogan, Dilek
    Azizoglu, Meral
    JOURNAL OF MANUFACTURING SYSTEMS, 2015, 36 : 46 - 54
  • [39] A novel integer programming formulation with logic cuts for the U-shaped assembly line balancing problem
    Fattahi, Ali
    Elaoud, Semya
    Azer, Erfan Sadeqi
    Turkay, Metin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (05) : 1318 - 1333
  • [40] Type-1 U-shaped Assembly Line Balancing under uncertain task time
    Li, Yuchen
    Hu, Xiaofeng
    Tang, Xiaowen
    Kucukkoc, Ibrahim
    IFAC PAPERSONLINE, 2019, 52 (13): : 992 - 997