This study deals with the problem of determining unit load sizes of automated guided vehicles (AGVs) in multi-product and multi-line assembly production systems. It is assumed that an AGV delivers assembly parts to each workstation of assembly lines from a miniload automated storag/retrieval system (AS/RS), and conveyor lines transport subassemblies between workstations. In this system, determination of the unit load sizes of parts carried by the AGV becomes an important decision factor due to its effects on the work-in-process inventory level and the operating cost of the system. Under a proposed AGV dispatching policy, a nonlinear mathematical model which allows unequal unit load sizes among assembly lines is formulated. Based on the characteristics of the objective function and feasible regions, a heuristic solution algorithm is developed. To illustrate the model, problems are chosen and solved.
引用
收藏
页码:3565 / 3581
页数:17
相关论文
共 50 条
  • [31] The emergy analysis of multi-product systems
    Cao, K.
    Feng, X.
    PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2007, 85 (B5) : 494 - 500
  • [32] Fixturing-driven determination of multi-product assembly plans in the context of product variety and reconfiguration
    Stief, Paul
    Dantan, Jean-Yves
    Etienne, Alain
    Siadat, Ali
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2024,
  • [33] Towards joint optimization of product design, process planning and production planning in multi-product assembly
    Tsutsumi, Daisuke
    Gyulai, David
    Kovacs, Andras
    Tipary, Bence
    Ueno, Yumiko
    Nonaka, Youichi
    Monostori, Laszlo
    CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2018, 67 (01) : 441 - 446
  • [34] An integrated production scheduling model for multi-product orders in VCIM systems
    Dao S.D.
    Abhary K.
    Marian R.
    International Journal of System Assurance Engineering and Management, 2017, 8 (1) : 12 - 27
  • [35] Production planning of multi-product kanban systems with significant setup times
    Krieg, GN
    Kuhn, H
    OPERATIONS RESEARCH PROCEEDINGS 2000, 2001, : 316 - 321
  • [36] An Approximate Analytical Method to Evaluate the Performance of Multi-Product Assembly Manufacturing Systems
    Colledani, Marcello
    Ratti, Andrea
    Senanayake, Chanaka
    9TH CIRP CONFERENCE ON INTELLIGENT COMPUTATION IN MANUFACTURING ENGINEERING - CIRP ICME '14, 2015, 33 : 357 - 363
  • [37] Decentralized multi-product multi-stage systems with backorders
    Gurgur, Cigdem Z.
    Altiok, Tayfur
    IIE TRANSACTIONS, 2008, 40 (03) : 238 - 251
  • [38] Towards multi-source multi-product energy systems
    Hemmes, K.
    Zachariah-Wolff, J. L.
    Geidl, M.
    Andersson, G.
    INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2007, 32 (10-11) : 1332 - 1338
  • [39] MULTI-PRODUCT INDUSTRIAL UNIT DYNAMIC-MODEL
    RAPHIKOV, MM
    SIRAZETDINOV, TK
    IZVESTIYA VYSSHIKH UCHEBNYKH ZAVEDENII AVIATSIONAYA TEKHNIKA, 1978, (02): : 74 - 82
  • [40] JOINT PRICING AND PRODUCTION PLANNING OF MULTI-PERIOD MULTI-PRODUCT SYSTEMS WITH UNCERTAINTY IN DEMAND
    Caccetta, Louis
    Mardaneh, Elham
    PACIFIC JOURNAL OF OPTIMIZATION, 2012, 8 (01): : 121 - 134