共 50 条
- [1] Dynamic simulation on mine-wide transport for designing and dispatching [J]. MINE PLANNING AND EQUIPMENT SECTION 1997, 1997, : 641 - 646
- [2] Mine-wide ground stability assessment and mine planning using the finite element technique [J]. COMPUTER METHODS AND ADVANCES IN GEOMECHANICS, VOL 2, 1997, : 1553 - 1558
- [3] Windows based computer data acquisition and control system provides cost/performance benefits for mine-wide monitoring [J]. PROCEEDINGS OF THE 6TH INTERNATIONAL MINE VENTILATION CONGRESS, 1997, : 77 - 81
- [4] INNOVATION OF MINE-WIDE PRODUCTION SYSTEM IN RAW MATERIAL RESOURCES AREA [J]. IDIMT-2013: INFORMATION TECHNOLOGY HUMAN VALUES, INNOVATION AND ECONOMY, 2013, 42 : 259 - 266
- [5] MINE-WIDE INFORMATION-SYSTEM DEVELOPMENT AT INCO-LIMITED [J]. CIM BULLETIN, 1992, 85 (960): : 65 - 70
- [8] Analysis of a Potential Correlation between Seismicity and Production in Kiruna Mine on a Mine-wide and an Extraction Block Scale [J]. BHM Berg- und Huttenmannische Monatshefte, 2023, 168 (06): : 299 - 304
- [10] The use of high frequency and mine-wide microseismic systems to monitor the movement of blasting induced stresses [J]. CIM BULLETIN, 2000, 93 (1040): : 90 - 95