CAUSES OF DELAY IN INDIAN CONSTRUCTION INDUSTRY

被引:5
|
作者
Venkatesh, M. P. [1 ]
Renuka, S. M. [1 ]
Umarani, C. [1 ]
机构
[1] Anna Univ, Dept Civil Engn, Madras 600025, Tamil Nadu, India
关键词
Delay; Construction Projects; India;
D O I
10.4028/www.scientific.net/AMM.174-177.2768
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Delays in a construction project can be regarded as a failure. This paper aims to investigate the causes of delay in Indian construction projects undertaken by private, government and nongovernmental organizations. In view of this 45 causes of delay were identified and developed the questionnaire for the quantitative confirmation of the most causes of delay. Consequently the questionnaire was distributed to construction professionals like Managers, Engineers and others. Subsequently the collected data was analyzed using statistical tool and the factors were measured and ranked under each group by importance index for various construction professionals. The results suggest that delays are mainly due to shortage of labours, shortage of construction materials and extra works (rework and change orders). The resources like manpower and materials are having highest contribution of about 24% compared to other sources. However this paper presents recommendations for a better project management techniques & procedures which can be adopted during conceptual & detailed planning phases of the project in order to minimize the construction delay.
引用
收藏
页码:2768 / 2773
页数:6
相关论文
共 50 条
  • [41] Exploring delay causes of road construction projects in Egypt
    Aziz, Remon F.
    Abdel-Hakam, Asmaa A.
    ALEXANDRIA ENGINEERING JOURNAL, 2016, 55 (02) : 1515 - 1539
  • [42] Delay Causes and Types in Nigerian Power Construction Projects
    Ismaila, Usman
    Jung, Wooyong
    Park, Chan Young
    ENERGIES, 2022, 15 (03)
  • [43] Causes of delay in offshore wind turbine construction projects
    Lerche, Jon
    Lindhard, Soren
    Enevoldsen, Peter
    Neve, Hasse H.
    Moller, Dan Eggert
    Jacobsen, Emil L.
    Teizer, Jochen
    Wandahl, Soren
    PRODUCTION PLANNING & CONTROL, 2023, 34 (15) : 1513 - 1526
  • [44] Barriers to implementing digitalization in the Indian construction industry
    Bajpai, Avirag
    Misra, Subhas C.
    INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2022, 39 (10) : 2438 - 2464
  • [45] THE VILLAGE CHIEF IN THE INDIAN CONSTRUCTION-INDUSTRY
    DUGAL, BS
    HUMAN ORGANIZATION, 1959, 18 (04) : 174 - 176
  • [46] Study on Engineers' Retention in Indian Construction Industry
    Kamal, S.
    Fathima, Hazeen
    Umarani, C.
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2778 - 2781
  • [47] Analysis of Causes of Delay and Time Performance in Construction Projects
    Gonzalez, Pablo
    Gonzalez, Vicente
    Molenaar, Keith
    Orozco, Francisco
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (01)
  • [48] Causes of Delay in Various Construction Projects: A Literature Review
    Mbala, Mbuyamba
    Aigbavboa, Clinton
    Aliu, John
    ADVANCES IN HUMAN FACTORS, SUSTAINABLE URBAN PLANNING AND INFRASTRUCTURE, 2019, 788 : 489 - 495
  • [49] A Pilot Survey on Causes of Delay in Malaysian Construction Project
    Tawil, Norngainy Mohd
    Khoiry, Muhamad Azry
    Hamzah, Noraini
    Arshad, Ishak
    Badaruzzaman, Wan Hamidon Wan
    BUILDING SURVEYING, FACILITIES MANAGEMENT AND ENGINEERING CONFERENCE (BSFMEC 2014), 2014, 15
  • [50] Causes of Delay on Highway Construction Project in Klang Valley
    Karunakaran, S.
    Ramli, M. Z.
    Malek, M. A.
    Musir, A. A.
    Imran, N. F.
    Fuad, N. F. S. M.
    Zawawi, M. H.
    Zainal, M. Z.
    GREEN DESIGN AND MANUFACTURE: ADVANCED AND EMERGING APPLICATIONS, 2018, 2030