共 50 条
- [31] A proposed value management framework for the Malaysian construction industry: a qualitative and quantitative investigation [J]. Proceedings of 2005 International Conference on Construction & Real Estate Management, Vols 1 and 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 658 - 663
- [32] Critical Success Factors of Project Quality Management System for Malaysian Construction Industry [J]. JURNAL TEKNOLOGI, 2015, 74 (02): : 123 - 131
- [34] Consensus Views on the Success Elements for Extension of Time Claim (EoT) in the Malaysian Construction Industry: A Modified Delphi Study [J]. 4TH INTERNATIONAL CONFERENCE ON RESEARCH METHODOLOGY FOR BUILT ENVIRONMENT AND ENGINEERING 2019, 2019, 385
- [36] A Study of Construction Claim Management Problems in Malaysia [J]. 2ND GLOBAL CONFERENCE ON BUSINESS, ECONOMICS, MANAGEMENT AND TOURISM, 2015, 23 : 63 - 70
- [37] Causes and Problem Identification in Construction Claim Management [J]. 1ST INTERNATIONAL POSTGRADUATE CONFERENCE ON MECHANICAL ENGINEERING (IPCME2018), 2019, 469
- [38] A Proposal for Improving Sustainability Practice through the Implementations of Reuse and Recycle Technique in Malaysian Construction Industry [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON APPLIED SCIENCE AND TECHNOLOGY 2016 (ICAST '16), 2016, 1761
- [39] An overview of knowledge management (KM) issues for implementation in consultant firms in Malaysian construction industry [J]. 10TH INTERNATIONAL SEMINAR ON INDUSTRIAL ENGINEERING AND MANAGEMENT: SUSTAINABLE DEVELOPMENT IN INDUSTRY AND MANAGEMENT, 2017, 277
- [40] Implementation of Building Information Modeling in Malaysian Construction Industry [J]. 3RD INTERNATIONAL CONFERENCE ON FUNDAMENTAL AND APPLIED SCIENCES (ICFAS 2014): INNOVATIVE RESEARCH IN APPLIED SCIENCES FOR A SUSTAINABLE FUTURE, 2014, 1621 : 343 - 349