Bi-objective optimisation model for installation scheduling in offshore wind farms

被引:29
|
作者
Irawan, Chandra Ade [1 ,2 ]
Jones, Dylan [1 ]
Ouelhadj, Djamila [1 ]
机构
[1] Univ Portsmouth, Dept Math, Ctr Operat Res & Logist, Lion Gate Bldg,Lion Terrace, Portsmouth PO1 3HF, Hants, England
[2] Inst Teknol Nas, Dept Ind Engn, Bandung 40124, Indonesia
关键词
Variable Neighbourhood Search; Simulated Annealing; Multi-objectives; Compromise programming; Installation scheduling; Offshore wind farm; ALGORITHM; SYSTEM; GOAL;
D O I
10.1016/j.cor.2015.09.010
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
A bi-objective optimisation using a compromise programming approach is proposed for installation scheduling of an offshore wind farm. As the installation cost and the completion period of the installation are important aspects in the construction of an offshore wind farm, the proposed method is used to deal with those conflicting objectives. We develop a mathematical model using integer linear programming (ILP) to determine the optimal installation schedule considering several constraints such as weather condition and the availability of vessels. We suggest two approaches to deal with the multi-objective installation scheduling problem, namely compromise programming with exact method and with metaheuristic techniques. In the exact method the problem is solved by CPLEX whereas in the metaheuristic approach we propose Variable Neighbourhood Search (VNS) and Simulated Annealing (SA). Moreover, greedy algorithms and a local search for solving the scheduling problem are introduced. Two generated datasets are used for testing our approaches. The computational experiments show that the proposed metaheuristic approaches produce interesting results as the optimal solution for some cases is obtained. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:393 / 407
页数:15
相关论文
共 50 条
  • [1] Optimisation of maintenance routing and scheduling for offshore wind farms
    Irawan, Chandra Ade
    Ouelhadj, Djamila
    Jones, Dylan
    Stalhane, Magnus
    Sperstad, Iver Bakken
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 256 (01) : 76 - 89
  • [2] Bi-objective mathematical model and improved algorithm for optimisation of welding shop scheduling problem
    Rao, Yunqing
    Meng, Ronghua
    Zha, Jing
    Xu, Xiaofei
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (09) : 2767 - 2783
  • [3] Bi-objective robust optimisation
    Kuhn, K.
    Raith, A.
    Schmidt, M.
    Schoebel, A.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 252 (02) : 418 - 431
  • [4] A bi-objective optimisation approach for the critical chain project scheduling problem
    Peng, Wuliang
    Lin, Jiali
    Ma, Xueli
    [J]. INTERNATIONAL JOURNAL OF COMPUTING SCIENCE AND MATHEMATICS, 2021, 13 (04) : 311 - 330
  • [5] Development of a risk analysis model for the installation of offshore wind farms
    Munoz, N. Garcia
    Lange, A. K.
    Kaczenski, J.
    Wiggert, M.
    [J]. EERA DEEPWIND CONFERENCE 2023, 2023, 2626
  • [6] Constrained non-linear multi-objective optimisation of preventive maintenance scheduling for offshore wind farms
    Zhong, Shuya
    Pantelous, Athanasios A.
    Beer, Michael
    Zhou, Jian
    [J]. MECHANICAL SYSTEMS AND SIGNAL PROCESSING, 2018, 104 : 347 - 369
  • [7] A bi-objective model for robust berth allocation scheduling
    Zhen, Lu
    Chang, Dao-Fang
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (01) : 262 - 273
  • [8] Representative Solutions for Bi-Objective Optimisation
    Demirovic, Emir
    Schwind, Nicolas
    [J]. THIRTY-FOURTH AAAI CONFERENCE ON ARTIFICIAL INTELLIGENCE, THE THIRTY-SECOND INNOVATIVE APPLICATIONS OF ARTIFICIAL INTELLIGENCE CONFERENCE AND THE TENTH AAAI SYMPOSIUM ON EDUCATIONAL ADVANCES IN ARTIFICIAL INTELLIGENCE, 2020, 34 : 1436 - 1443
  • [9] An optimisation model for scheduling the decommissioning of an offshore wind farm
    Chandra Ade Irawan
    Graham Wall
    Dylan Jones
    [J]. OR Spectrum, 2019, 41 : 513 - 548
  • [10] An optimisation model for scheduling the decommissioning of an offshore wind farm
    Irawan, Chandra Ade
    Wall, Graham
    Jones, Dylan
    [J]. OR SPECTRUM, 2019, 41 (02) : 513 - 548