Multi-objective no-wait flowshop scheduling problems: models and algorithms

被引:19
|
作者
Naderi, B. [1 ]
Aminnayeri, M. [2 ]
Piri, M. [3 ]
Yazdi, M. H. Ha'iri [4 ]
机构
[1] Univ Tehran, Dept Ind Engn, Fac Engn, Tehran, Iran
[2] Amirkabir Univ Technol, Dept Ind Engn, Tehran, Iran
[3] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
[4] Univ Tehran, Sch Mech Engn, Fac Engn, Tehran, Iran
关键词
no-wait flowshop scheduling; multi-objective iterated local search algorithm; mixed integer linear programming model; ITERATED GREEDY ALGORITHM; HEURISTIC ALGORITHMS; COMPLETION-TIME; PARTICLE SWARM; TOTAL FLOWTIME; M-MACHINE; MAKESPAN; MINIMIZE; OPTIMIZATION; VARIANCE;
D O I
10.1080/00207543.2010.543937
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article studies multi-objective no-wait flowshop scheduling problems to minimise both makespan and total tardiness. This problem is commonly denoted by F/nwt/TT, C-max. This article mathematically formulates the problem using two effective multi-objective mixed integer linear programming models. The multi-objective mathematical models are then solved by a multiple criteria decision making approach, called Fuzzy programming method. Moreover, the article proposes a novel multi-objective iterated local search algorithm incorporating three types of local search engine: greedy, moderate and curtailed fashions. The algorithm is carefully evaluated for its performance against two available algorithms by means of multi-objective performance measures and statistical tools. The results show that the proposed solution method outperforms the others.
引用
收藏
页码:2592 / 2608
页数:17
相关论文
共 50 条
  • [1] Multi-objective no-wait hybrid flowshop scheduling problem with transportation times
    Khalili, Majid
    [J]. INTERNATIONAL JOURNAL OF COMPUTATIONAL SCIENCE AND ENGINEERING, 2012, 7 (02) : 147 - 154
  • [2] HEURISTIC ALGORITHMS FOR SCHEDULING IN THE NO-WAIT FLOWSHOP
    GANGADHARAN, R
    RAJENDRAN, C
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 32 (03) : 285 - 290
  • [3] A multi-objective electromagnetism algorithm for a bi-objective hybrid no-wait flowshop scheduling problem
    Majid Khalili
    [J]. The International Journal of Advanced Manufacturing Technology, 2014, 70 : 1591 - 1601
  • [4] A multi-objective electromagnetism algorithm for a bi-objective hybrid no-wait flowshop scheduling problem
    Khalili, Majid
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (9-12): : 1591 - 1601
  • [5] A multi-objective electromagnetism algorithm for a bi-objective hybrid no-wait flowshop scheduling problem
    20141117457247
    [J]. Khalili, M. (Khalili.mj@gmail.com), 1600, Springer London (70): : 9 - 12
  • [6] Discrete Artificial Bee Colony Algorithm for Multi-objective Distributed Heterogeneous No-wait Flowshop Scheduling Problem
    Li, Haoran
    Gao, Liang
    Li, Xinyu
    [J]. Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2023, 59 (02): : 291 - 306
  • [7] STOCHASTIC FLOWSHOP NO-WAIT SCHEDULING
    FROSTIG, E
    ADIRI, I
    [J]. JOURNAL OF APPLIED PROBABILITY, 1985, 22 (01) : 240 - 246
  • [8] Study on No-Wait Flexible Flow Shop Scheduling with Multi-objective
    Tao, Ze
    Liu, Xiaoxia
    [J]. INTELLIGENT ROBOTICS AND APPLICATIONS, ICIRA 2019, PART VI, 2019, 11745 : 457 - 468
  • [9] A novel multi-objective particle swarm optimization algorithm for no-wait flow shop scheduling problems
    Pan, Q-K
    Wang, L.
    Qian, B.
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2008, 222 (04) : 519 - 539
  • [10] Multi-objective scheduling for multi-product batch process with no-wait constraint
    Deng, Guan-Long
    Tian, Guang-Dong
    Gu, Xing-Sheng
    [J]. Kongzhi yu Juece/Control and Decision, 2017, 32 (03): : 474 - 480