Effects of δ-hydride precipitation at a crack tip on crack propagation in delayed hydride cracking of Zircaloy-2

被引:13
|
作者
Kubo, T. [1 ]
Kobayashi, Y. [2 ]
机构
[1] Nippon Nucl Fuel Dev Co Ltd, Oarai, Ibaraki 3111313, Japan
[2] MOX Co Ltd, Mito, Ibaraki 3110853, Japan
关键词
ZIRCONIUM ALLOYS; FRACTURE INITIATION; HYDROGEN CRACKING; CLADDING TUBES; STRESS; SOLUBILITY; BEHAVIOR; TEMPERATURES; DIFFUSION; ZR-2.5NB;
D O I
10.1016/j.jnucmat.2013.04.015
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Delayed hydride cracking (DHC) of Zircaloy-2 is one possible mechanism for the failure of boiling water reactor fuel rods in ramp tests at high burnup. Analyses were made for hydrogen diffusion around a crack tip to estimate the crack velocity of DHC in zirconium alloys, placing importance on effects of precipitation of delta-hydride. The stress distribution around the crack tip is significantly altered by precipitation of hydride, which was strictly analyzed using a finite element computer code. Then, stress-driven hydrogen diffusion under the altered stress distribution was analyzed by a differential method. Overlapping of external stress and hydride precipitation at a crack tip induces two stress peaks; one at a crack tip and the other at the front end of the hydride precipitate. Since the latter is larger than the former, more hydrogen diffuses to the front end of the hydride precipitate, thereby accelerating hydride growth compared with that in the absence of the hydride. These results indicated that, after hydride was formed in front of the crack tip, it grew almost steadily accompanying the interaction of hydrogen diffusion, hydride growth and the stress alteration by hydride precipitation. Finally, crack velocity was estimated from the calculated hydrogen flux into the crack tip as a function of temperature, stress intensity factor and material strength. There was qualitatively good agreement between calculation results and experimental data. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:202 / 211
页数:10
相关论文
共 50 条
  • [31] THE FRACTURE OF HYDRIDED MATERIAL DURING DELAYED HYDRIDE CRACKING (DHC) CRACK-GROWTH
    SMITH, E
    [J]. INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 1995, 61 (01) : 1 - 7
  • [32] Evaluation of variables affecting crack propagation by Delayed Hydride Cracking in Zr-2.5Nb with different heat treatments
    Mieza, J. I.
    Vigna, G. L.
    Domizzi, G.
    [J]. JOURNAL OF NUCLEAR MATERIALS, 2011, 411 (1-3) : 150 - 159
  • [33] THE HYDROSTATIC STRESS-FIELD AROUND THE CRACK TIP IN ZIRCONIUM 2.5-PERCENT NIOBIUM AND IMPLICATIONS FOR DELAYED HYDRIDE CRACKING
    EADIE, RL
    MOK, D
    SCARTH, D
    LEGER, M
    [J]. SCRIPTA METALLURGICA ET MATERIALIA, 1991, 25 (02): : 497 - 502
  • [34] Statistical analysis of hydride reorientation properties in irradiated zircaloy-2
    Valance S.
    Bertsch J.
    Alam A.M.
    [J]. Journal of ASTM International, 2011, 8 (01):
  • [35] Strain evolution of zirconium hydride embedded in a Zircaloy-2 matrix
    Kerr, M.
    Daymond, M. R.
    Holt, R. A.
    Almer, J. D.
    [J]. JOURNAL OF NUCLEAR MATERIALS, 2008, 380 (1-3) : 70 - 75
  • [36] Temperature and hydrogen concentration limits for delayed hydride cracking in irradiated zircaloy
    Schofield, JS
    Darby, EC
    Gee, CF
    [J]. ZIRCONIUM IN THE NUCLEAR INDUSTRY: THIRTEENTH INTERNATIONAL SYMPOSIUM, 2002, 1423 : 339 - 355
  • [37] SLOW CRACK GROWTH BY HYDRIDE PRECIPITATION IN ZIRCONIUM ALLOYS
    SIMPSON, LA
    [J]. ENGINEERING FRACTURE MECHANICS, 1979, 11 (02) : 468 - 468
  • [38] Tensile properties of welded joints with delayed hydride crack
    Zhu, Aizhu
    Liu, An
    Zhu, Hongping
    Zhou, Longzao
    [J]. JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2024, 213
  • [39] HIGH STRAIN CRACK GROWTH IN ZIRCALOY-2 WELDS
    SOLOMON, HD
    [J]. NUCLEAR TECHNOLOGY, 1976, 29 (01) : 86 - 93
  • [40] ENGINEERING RELATION FOR DEPENDENCE OF THRESHOLD STRESS INTENSITY FACTOR FOR DELAYED HYDRIDE CRACKING ON CRACK ORIENTATION
    Scarth, Douglas A.
    Shek, Gordon K.
    Xu, Steven X.
    [J]. PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE - 2008, VOL 6, PT A AND B, 2009, : 29 - 42