Research on Choosing Project Company for BOT with Additional Project

被引:0
|
作者
Tan Wei [1 ]
Tan De-qing [1 ]
Wen Yao-hua [2 ]
Chen Lei [1 ]
机构
[1] Southwest Jiaotong Univ, Sch Econ & Management, Chengdu, Peoples R China
[2] CHECC, Design & Res Inst, Kunming Hydro Elect Investigat, Kunming, Peoples R China
关键词
BOT project; project company; additional project; biform game; game theory;
D O I
暂无
中图分类号
TN [电子技术、通信技术];
学科分类号
0809 ;
摘要
For the BOT project with additional project, considering three different types of project companies, this paper applied biform game theory to analyze the Nash equilibrium and core allocation on the basis of Nash equilibrium under noncooperative game theory, and concluded the additional project's effect on efficient concession term. The result shows that the development right of additional project and some other factors affect the interval of biform game's core allocation; the company's type affects the company's power for competition or bargaining about payoff. Each type of company could be chosen If it has sufficient advantages. This study also has provided a scientific and systematic program/mechanism for choosing a best project company for BOT project with additional project.
引用
下载
收藏
页码:7494 / +
页数:2
相关论文
共 50 条
  • [1] CHOOSING A RESEARCH-PROJECT
    GUTHRIE, E
    BLACK, D
    BRITISH JOURNAL OF HOSPITAL MEDICINE, 1991, 46 (05): : 335 - 336
  • [2] Choosing a Research Project and a Research Mentor
    Bettmann, Michael
    CIRCULATION, 2009, 119 (13) : 1832 - 1835
  • [3] Choosing the right project management software for your company
    Allnoch, A
    IIE SOLUTIONS, 1997, 29 (03): : 38 - &
  • [4] A research on the risks and prevention strategies of BOT project
    Yang Aijie
    Proceedings of 2005 International Conference on Innovation & Management, 2005, : 1167 - 1171
  • [5] The research of risk management of BOT investment project
    Chen Ling
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 964 - 967
  • [6] The Research on the Hold-Up Problem of BOT Project
    Li, Wen-xin
    Peng, Wen-min
    2013 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT SCIENCE (ICIEMS 2013), 2013, : 423 - 429
  • [7] Research of Risk Management on XY Expressway BOT Project
    Wang, Qiu-ju
    Xue, Da-shen
    INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND SOFTWARE ENGINEERING (AISE 2014), 2014, : 271 - 276
  • [8] The Research of Performance Evaluation System for Project Managers in Project-Oriented Company
    Yue, Qi-qi
    Ou, Li-xiong
    Hao, Li
    NINTH CHINA PROJECT MANAGEMENT CONFERENCE, 2010, : 236 - 240
  • [9] Research on Contract Management for the Urban Rail Transport BOT Project
    Li, Weifang
    PROCEEDINGS OF THE 2017 7TH INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT, COMPUTER AND SOCIETY (EMCS 2017), 2017, 61 : 1698 - 1702
  • [10] BOT Project Risk Estimation
    Liu, Ning
    Liu, Yachen
    Yu, Xiaosi
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 2041 - 2044