Social indicators for sustainable project and technology life cycle management in the process industry

被引:1
|
作者
Labuschagne, C [1 ]
Brent, AC [1 ]
机构
[1] Univ Pretoria, Dept Engn & Technol Management, Chair Life Cycle Engn, ZA-0002 Pretoria, South Africa
来源
关键词
Life Cycle Impact Assessment (LCIA); Life Cycle Management (LCM); process industry; Resource Impact Indicator (RII); Social Impact Indicator (SII); social sustainability;
D O I
10.1065/lca2006.01.233
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Goal, Scope and Background. The importance of the social dimension of sustainable development increased significantly during the last decade of the twentieth century. Industry has subsequently experienced a shift in stakeholder pressures from environmental to social-related concerns, where new developments in the form of projects and technologies are undertaken. However, the measurement of social impacts and the calculation of suitable indicators are less well developed compared to environmental indicators in order to assess the potential liabilities associated with undertaken projects and technologies. The aim of this paper is to propose a Social Impact Indicator (SII) calculation procedure based on a previously introduced Life Cycle Impact Assessment (LCIA) calculation procedure for environmental Resource Impact Indicators (RIIs), and to demonstrate the practicability of the SII procedure in the context of the process industry in South Africa. Methods. A framework of social sustainability criteria has been introduced for the South African process industry. The social sub-criteria of the framework are further analyzed, based on project and technology management expertise in the South African process industry, to determine whether the criteria should be addressed at project or technology management level or whether they should rather form part of an overall corporate governance policy for new projects and technologies. Furthermore, the proposed indicators for criteria that are considered appropriate for project or technology evaluation purposes are constrained by the type of information that is available, i.e. the calculation methodology relies on the availability of regional or national social information where the project will be implemented, as well as the availability of project- or technology-specific social information during the various phases of the project or technology development life cycle. Case studies in the process industry and statistical information for South Africa are subsequently used to establish information availability for the SII calculation procedure, demonstrate the SII method together with the RII method, and determine the practical use of the SII method. Results and Conclusion. The case studies establish that social footprint information as well as project- and technology social data are not readily available in the South African process industry. Consequently, the number of mid-point categories that can be evaluated are minimal, which results in an impaired social picture when compared to the environmental dimension. It is concluded that a quantitative social impact assessment method cannot be applied for project and technology life cycle management purposes in industry at present. Recommendation and Perspective. Following the outcomes of the case studies in the South African process industry, it is recommended that checklists and guidelines be used during project and technology life cycle management practices. Similar to the environmental dimension, it is envisaged that such checklists and guidelines would improve the availability of quantitative data in time, and would therefore make the SII procedure more practical in the future.
引用
收藏
页码:3 / 15
页数:13
相关论文
共 50 条
  • [41] Storytelling for project knowledge management across the project life cycle
    Farzaneh, Narges
    Shamizanjani, Mehdi
    KNOWLEDGE MANAGEMENT & E-LEARNING-AN INTERNATIONAL JOURNAL, 2014, 6 (01) : 83 - 97
  • [42] Analysis of the Publishing Industry of Project Management Process
    Liu Yongjian
    Bai Lihua
    PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, VOLS I AND II, 2009, : 2075 - 2079
  • [43] Concurrent construction and life cycle project management
    Jaafari, A
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1997, 123 (04): : 427 - 436
  • [44] Integrating sustainability indicators into project management: The case of construction industry
    Stanitsas, Marios
    Kirytopoulos, Konstantinos
    Leopoulos, Vrassidas
    JOURNAL OF CLEANER PRODUCTION, 2021, 279
  • [45] LIFE CYCLE CANVAS (LCC): A VISUAL MODEL FOR THE PROJECT LIFE CYCLE MANAGEMENT
    Medeiros, Bruno Campelo
    da Silva Araujo, Vilma Felix
    de Almeida e Silva Oliveira, Mylena Karlla
    REVISTA DE GESTAO E PROJETOS, 2018, 9 (01): : 87 - 101
  • [46] On the Importance of Project Management Capabilities for Sustainable Business Process Management
    Plattfaut, Ralf
    SUSTAINABILITY, 2022, 14 (13)
  • [47] Asset life cycle management: towards improving physical asset performance in the process industry
    Schuman, CA
    Brent, AC
    INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2005, 25 (5-6) : 566 - 579
  • [48] The Liberty of Life through Social Technology project
    Ikonen, T
    IMPROVING THE QUALITY OF LIFE FOR THE EUROPEAN CITIZEN: TECHNOLOGY FOR INCLUSIVE DESIGN AND EQUALITY, 1998, 4 : 135 - 138
  • [49] Selection Process of Sustainable Indicators for the Algarve Region-OBSERVE Project
    Farinha, Fatima
    Oliveira, Miguel Jose
    Silva, Elisa M. J.
    Lanca, Rui
    Pinheiro, Manuel Duarte
    Miguel, Catia
    SUSTAINABILITY, 2019, 11 (02)
  • [50] RESEARCH ON THE DELICACY MANAGEMENT DURING THE WHOLE LIFE CYCLE OF ENGINEERING PROJECT BASED ON BIM TECHNOLOGY
    Yin, Xiaojing
    FRESENIUS ENVIRONMENTAL BULLETIN, 2020, 29 (12A): : 11783 - 11789