A novel multi-objective optimization algorithm for the integrated scheduling of flexible job shops considering preventive maintenance activities and transportation processes

被引:37
|
作者
Wang, Hui [1 ]
Sheng, Buyun [1 ]
Lu, Qibing [1 ]
Yin, Xiyan [1 ]
Zhao, Feiyu [1 ]
Lu, Xincheng [1 ]
Luo, Ruiping [1 ]
Fu, Gaocai [1 ]
机构
[1] Wuhan Univ Technol, Sch Mech & Elect Engn, Wuhan 430070, Hubei, Peoples R China
关键词
Flexible job shop scheduling problem; Preventive maintenance activities; Transportation process; Multi-objective optimization; Multi-region division sampling strategy; BEE COLONY ALGORITHM; MATHEMATICAL-MODELS; MACHINES; SYSTEM; TIMES;
D O I
10.1007/s00500-020-05347-z
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Most production scheduling problems, including standard flexible job shop scheduling problems, assume that machines are continuously available. However, in most cases, due to preventive maintenance activities, machines may not be available for a certain time. Meanwhile, in the entire workshop production process, the transportation process of workpieces cannot be ignored. Therefore, the impact of transportation on the production planning should be considered in the scheduling process. To consider both preventive maintenance and transportation processes in the flexible job shop scheduling problem, this paper proposes a flexible job shop scheduling problem considering preventive maintenance activities and transportation processes and establishes a multi-objective flexible job shop scheduling model optimizing the total energy consumption and total makespan. Furthermore, a multi-region division sampling strategy-based multi-objective optimization algorithm integrated with a genetic algorithm and a differential evolution algorithm (MDSS-MOGA-DE) is proposed to solve the model. In the proposed algorithm, a multi-region division sampling strategy and two evaluation functions are utilized to improve the diversity of solutions. In addition, this paper combines a genetic operation and a differential operation to further enhance the search ability of the algorithm. The validity of the algorithm is verified by a real case. The computational results reveal that the proposed model and algorithm obtain appropriate results and have the potential to be applied to other similar problems.
引用
收藏
页码:2863 / 2889
页数:27
相关论文
共 50 条
  • [31] Scheduling multi-objective job shops using a memetic algorithm based on differential evolution
    Qian, Bin
    Wang, Ling
    Huang, De-Xian
    Wang, Xiong
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 35 (9-10): : 1014 - 1027
  • [32] A Memetic Algorithm for the Multi-Objective Flexible Job Shop Scheduling Problem
    Yuan, Yuan
    Xu, Hua
    [J]. GECCO'13: PROCEEDINGS OF THE 2013 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 2013, : 559 - 566
  • [33] A PARTICLE SWARM OPTIMIZATION ALGORITHM FOR THE MULTI-OBJECTIVE FLEXIBLE JOB-SHOP SCHEDULING PROBLEM
    Sun, Ying
    He, Jingbo
    [J]. JOURNAL OF NONLINEAR AND CONVEX ANALYSIS, 2024, 25 (03) : 579 - 590
  • [34] Scheduling multi-objective job shops using a memetic algorithm based on differential evolution
    Department of Automation, Tsinghua University, Beijing 100084, China
    [J]. International Journal of Advanced Manufacturing Technology, 2008, 35 (9-10): : 1014 - 1027
  • [35] Multi-objective optimization of generation maintenance scheduling considering demand response
    考虑需求响应的多目标机组检修调度优化
    [J]. 1600, Power System Protection and Control Press (48): : 110 - 118
  • [36] Energy Saving Optimization Method of Flexible Job Shop Scheduling Considering Preventive Maintenance
    考虑设备预维护的柔性作业车间调度节能优化方法
    [J]. Li, Congbo (congboli@cqu.edu.cn), 1600, Chinese Mechanical Engineering Society (57): : 220 - 230
  • [37] Application of multi-objective memetic algorithm in multi-objective flexible job-shop scheduling problem
    Zhenwen, H.U.
    [J]. Academic Journal of Manufacturing Engineering, 2019, 17 (03): : 24 - 28
  • [38] Energy-efficient scheduling for multi-objective flexible job shops with variable processing speeds by grey wolf optimization
    Luo, Shu
    Zhang, Linxuan
    Fan, Yushun
    [J]. JOURNAL OF CLEANER PRODUCTION, 2019, 234 : 1365 - 1384
  • [39] Multi-objective optimization for Periodic Preventive Maintenance
    Zade, Amir Ebrahimi
    Barak, Sasan
    Maghsoudlou, Hamidreza
    Toloo, Mehdi
    [J]. 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 173 - 182
  • [40] A novel multi-objective bacteria foraging optimization algorithm(MOBFOA) for multi-objective scheduling
    Kaur, Mandeep
    Kadam, Sanjay
    [J]. APPLIED SOFT COMPUTING, 2018, 66 : 183 - 195