Down time analysis of hard rock TBM case histories

被引:0
|
作者
Farrokh, E. [1 ]
Rostami, J. [1 ]
Askilsrud, O. G. [2 ]
机构
[1] Penn State Univ, Dept Energy & Mineral Engn, University Pk, PA 16802 USA
[2] Tunnel Engn Applicat Inc, Renton, WA 98059 USA
基金
美国国家科学基金会;
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
One of the major components of evaluating TBM performance is down time analysis. In most TBM applications, the proportion of downtime is higher than the boring or production time. Study and development of the predictive capabilities for estimation of downtime and subsequently machine utilization in a given project is one of the requirements for accurate estimation of TBM performance and daily advance rate. This paper will offer in-depth analysis of reported downtime for different hard rock TBM tunneling projects including some that are underway or completed in recent years. This includes the analysis of records for various activities for 89 TBM tunnel projects from around the world. This will include the comparison of recorded downtimes with those predicted by the existing models. The poor correlation between predicted and actual downtime components can be attributed to several factors such as lack of a uniform protocol for recording and classifying the downtimes and/or averaging effects of downtimes over the whole length of the tunnel or certain subset. Also, the study indicates that the previous published empirical models might be outdated or in some cases incompatible with new machines and their operational settings. This study will identify and analyze the different causes of downtime on the basis of average duration of each individual activity and will offer some guidelines for prediction of downtime for given project conditions.
引用
下载
收藏
页码:1133 / 1140
页数:8
相关论文
共 50 条
  • [31] Layout design specifications of hard-rock TBM cutterheads at maximum cutter penetration and TBM advance
    Farrokh E.
    Arabian Journal of Geosciences, 2021, 14 (19)
  • [32] Investigating the effect of discontinuity geometrical parameters on the TBM performance in hard rock
    Afrasiabi, Navid
    Rafiee, Ramin
    Noroozi, Mehdi
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 84 : 326 - 333
  • [33] Recent developments in site investigation and testing for hard rock TBM projects
    Nilsen, B
    Ozdemir, L
    1999 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 1999, : 715 - 731
  • [34] Performance Prediction of Hard Rock TBM Based on Extreme Learning Machine
    Shao, Chengjun
    Li, Xiuliang
    Su, Hongye
    INTELLIGENT ROBOTICS AND APPLICATIONS, PT II, 2013, 8103 : 409 - 416
  • [35] Performance Predictions of Hard Rock TBM in Subcritical Cutter Load Conditions
    A. Dardashti
    R. Ajalloeian
    J. Rostami
    J. Hassanpour
    A. Salimi
    Rock Mechanics and Rock Engineering, 2024, 57 (1) : 739 - 755
  • [36] A new hard rock TBM performance prediction model for project planning
    Hassanpour, J.
    Rostami, J.
    Zhao, J.
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2011, 26 (05) : 595 - 603
  • [37] Multifactorial fuzzy approach to the penetrability classification of TBM in hard rock conditions
    Mikaeil, Reza
    Naghadehi, Masoud Zare
    Sereshki, Farhang
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2009, 24 (05) : 500 - 505
  • [38] Prediction of Hard Rock TBM Penetration Rate Using Random Forests
    Hu Tao
    Wang Jingcheng
    Zhang Langwen
    2015 27TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2015, : 3716 - 3720
  • [39] Performance Predictions of Hard Rock TBM in Subcritical Cutter Load Conditions
    Dardashti, A.
    Ajalloeian, R.
    Rostami, J.
    Hassanpour, J.
    Salimi, A.
    ROCK MECHANICS AND ROCK ENGINEERING, 2024, 57 (01) : 739 - 755
  • [40] Adaptive design of shield radius for open type hard rock TBM
    Tian Y.-C.
    He F.
    Zhang X.
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2019, 53 (12): : 2280 - 2288