Down time analysis of hard rock TBM case histories

被引:0
|
作者
Farrokh, E. [1 ]
Rostami, J. [1 ]
Askilsrud, O. G. [2 ]
机构
[1] Penn State Univ, Dept Energy & Mineral Engn, University Pk, PA 16802 USA
[2] Tunnel Engn Applicat Inc, Renton, WA 98059 USA
基金
美国国家科学基金会;
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
One of the major components of evaluating TBM performance is down time analysis. In most TBM applications, the proportion of downtime is higher than the boring or production time. Study and development of the predictive capabilities for estimation of downtime and subsequently machine utilization in a given project is one of the requirements for accurate estimation of TBM performance and daily advance rate. This paper will offer in-depth analysis of reported downtime for different hard rock TBM tunneling projects including some that are underway or completed in recent years. This includes the analysis of records for various activities for 89 TBM tunnel projects from around the world. This will include the comparison of recorded downtimes with those predicted by the existing models. The poor correlation between predicted and actual downtime components can be attributed to several factors such as lack of a uniform protocol for recording and classifying the downtimes and/or averaging effects of downtimes over the whole length of the tunnel or certain subset. Also, the study indicates that the previous published empirical models might be outdated or in some cases incompatible with new machines and their operational settings. This study will identify and analyze the different causes of downtime on the basis of average duration of each individual activity and will offer some guidelines for prediction of downtime for given project conditions.
引用
收藏
页码:1133 / 1140
页数:8
相关论文
共 50 条
  • [1] In situ TBM penetration tests and rock mass boreability analysis in hard rock tunnels
    Gong, Q. M.
    Zhao, J.
    Jiang, Y. S.
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2007, 22 (03) : 303 - 316
  • [2] NSVR based predictive analysis of cutterhead torque for hard rock TBM
    Wang C.
    Gong G.-F.
    Yang H.-Y.
    Zhou J.-J.
    Duan L.-W.
    Zhang Y.-K.
    [J]. Gong, Guo-Fang (gfgong@zju.edu.cn), 2018, Zhejiang University (52): : 479 - 486
  • [3] Introducing hard rock TBMs' downtime analysis model with reference to past case histories' data
    Farrokh, E.
    [J]. JOURNAL OF MINING AND ENVIRONMENT, 2018, 9 (02): : 457 - +
  • [4] Empirical estimates of TBM performance in hard rock
    Stevenson, GW
    [J]. 1999 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 1999, : 993 - 1009
  • [5] Developments of Mixshields and Hard-Rock TBM
    Herrenknecht, A
    Rehm, U
    [J]. (RE)CLAIMING THE UNDERGROUND SPACE, VOLS 1 AND 2, PROCEEDINGS, 2003, : 725 - 730
  • [6] Analysis and prediction of small-diameter TBM performance in hard rock conditions
    Lehmann, Gabriel
    Kaeling, Heiko
    Hoch, Sebastian
    Thuro, Kurosch
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 143
  • [7] Determination of the system behaviour based on data analysis of a hard rock shield TBM
    Analyse der Maschinenparameter zur Erfassung des Systemverhaltens beim Hartgesteins-Schildvortrieb
    [J]. 1600, Ernst und Sohn (07):
  • [8] Analysis and prediction of small-diameter TBM performance in hard rock conditions
    Lehmann, Gabriel
    Käsling, Heiko
    Hoch, Sebastian
    Thuro, Kurosch
    [J]. Tunnelling and Underground Space Technology, 2024, 143
  • [9] Analysis and Prediction of Small-Diameter Tbm Performance in Hard Rock Conditions
    Lehmann, Gabriel
    Käsling, Heiko
    Hoch, Sebastian
    Thuro, Kurosch
    [J]. SSRN, 2023,
  • [10] Probabilistic analysis of the disc cutter failure during TBM tunneling in hard rock
    Jin, Dalong
    Yuan, Dajun
    Li, Xinggao
    Su, Weilin
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 109