Plant-Wide Process Real-Time Optimization Based on Process Goose Queue Methodology

被引:0
|
作者
Huang, Jingwen [1 ]
Li, Hongguang [1 ]
机构
[1] Beijing Univ Chem Technol, Beijing 100029, Peoples R China
关键词
real-time optimization(RTO); plant-wide process; process goose queue(PGQ);
D O I
10.1016/j.proeng.2012.01.345
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
In order to overcome the algorithmic deficiencies associated with conventional real-time optimization(RTO) such as huge process models, enormous manipulated variables, a so-called process goose queue (PGQ) technique is subsequently established inspired by biologic nature of flying wild geese. Taking advantage of this ad-hoc structure, a plant-wide process can be decomposed into several hierarchically connected PGQs, accordingly, process RTO identical with the following and tracking issues between leading and following geese. Followed by this philosophy, related theoretical definitions, the adjustment rules, implement procedure are explicitly introduced. Finally, a straightforward plant-wide process is employed to demonstrate the feasibility and validity of the contributions. (C) 2011 Published by Elsevier Ltd. Selection and/or peer-review under responsibility of Harbin University of Science and Technology
引用
下载
收藏
页码:2526 / 2531
页数:6
相关论文
共 50 条
  • [41] Framework of Closed-loop Optimization System for Operation Management in Plant-wide Production Process
    Liu, Changxin
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ELECTRONIC & MECHANICAL ENGINEERING AND INFORMATION TECHNOLOGY (EMEIT-2012), 2012, 23
  • [42] Integrated plant-wide condition monitoring and process data system
    不详
    INSIGHT, 1998, 40 (12) : 809 - 809
  • [43] Plant-wide Model Predictive Control for a Continuous Pharmaceutical Process
    Mesbah, Ali
    Paulson, Joel A.
    Lakerveld, Richard
    Braatz, Richard D.
    2015 AMERICAN CONTROL CONFERENCE (ACC), 2015, : 4301 - 4307
  • [44] Methodic fault diagnosis of plant-wide disturbances in process industries
    Bauer, Margret
    Horch, Alexander
    ATP EDITION, 2008, (05): : 20 - 25
  • [45] Plant-Wide Industrial Process Monitoring: A Distributed Modeling Framework
    Ge, Zhiqiang
    Chen, Junghui
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2016, 12 (01) : 310 - 321
  • [46] Integrated plant-wide condition monitoring and process data system
    Insight: Non-Destructive Testing and Condition Monitoring, 1998, 40 (12):
  • [47] Plant-wide control structure selection methodology based on economics
    Psaltis, Andreas
    Kookos, Ioannis K.
    Kravaris, Costas
    COMPUTERS & CHEMICAL ENGINEERING, 2013, 52 : 240 - 248
  • [48] Distributed Optimization Subject to Inseparable Coupled Constraints: A Case Study on Plant-Wide Ethylene Process
    Liu, Weihan
    Wang, Ting
    Li, Zhongmei
    Ye, Zhencheng
    Peng, Xin
    Du, Wenli
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2023, 19 (04) : 5412 - 5421
  • [49] Real-time optimization for gold cyanidation leaching process
    Zhang, Jun
    Mao, Zhi-Zhong
    Jia, Run-Da
    Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2014, 31 (09): : 1198 - 1205
  • [50] Distributed plant-wide process monitoring based on PCA with minimal redundancy maximal relevance
    Xu, Chen
    Zhao, Shunyi
    Liu, Fei
    CHEMOMETRICS AND INTELLIGENT LABORATORY SYSTEMS, 2017, 169 : 53 - 63