Minimizing energy consumption and tardiness penalty for fuzzy flow shop scheduling with state-dependent setup time

被引:72
|
作者
Liu, Guo-Sheng [1 ]
Zhou, Ya [1 ]
Yang, Hai-Dong [2 ]
机构
[1] Guangdong Univ Technol, Sch Management, 161 Yinglong Rd, Guangzhou 510520, Guangdong, Peoples R China
[2] Guangdong Univ Technol, Sch Electromech Engn, 100 West Waihuan Rd, Guangzhou 510006, Guangdong, Peoples R China
基金
中国国家自然科学基金;
关键词
Flow shop scheduling; Energy consumption; Setup time; Fuzzy processing time; Genetic algorithm; GENETIC ALGORITHMS; PROCESSING TIMES; ENVIRONMENT;
D O I
10.1016/j.jclepro.2016.12.044
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper addresses a flow shop scheduling problem in a production system where the machine setup times depend on their prior states. State-dependent setup times exist widely in thermal facilities such as boilers and furnaces. The fuzzy set theory is introduced to describe the uncertainty of processing times and due dates in this study. The goal of the proposed fuzzy flow shop scheduling problem is to dispatch jobs to the machines and to determine the job sequence and state transition of each machine to minimize energy consumption and tardiness. To most efficiently determine the impact of uncertainty, the problem is formulated based on accurate operations of fuzzy numbers, which differ from approximate calculations in the existing literature on scheduling. To solve the problem, two common pattern matching schemes and heuristics are proposed to be combined with the classical genetic algorithm. Computational experiments show that the proposed GA performs better than the random key GA method, especially for large problems. The numerical results also provide practical implications for the proposed problem. The state-dependent setup time constraint significantly influences the scheduling results. In addition, the objective can be improved by reducing the uncertainty of processing times and due dates. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:470 / 484
页数:15
相关论文
共 50 条
  • [1] Minimizing the Makespan and Total Tardiness in Hybrid Flow Shop Scheduling with Sequence-Dependent Setup Times
    Mousavi, Seyyed Mostafa
    Shahnazari-shahrezaei, Parisa
    [J]. MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2023, 14 (01) : 13 - 24
  • [2] Minimizing Tardiness Penalty Costs in Job Shop Scheduling under Maximum Allowable Tardiness
    Kim, Jae-Gon
    Jun, Hong-Bae
    Bang, June-Young
    Shin, Jong-Ho
    Choi, Seong-Hoon
    [J]. PROCESSES, 2020, 8 (11) : 1 - 15
  • [3] Genetic algorithm for minimizing tardiness in flow-shop scheduling
    Onwubolu, GC
    Mutingi, M
    [J]. PRODUCTION PLANNING & CONTROL, 1999, 10 (05) : 462 - 471
  • [4] Minimizing the maximum tardiness for a permutation flow shop problem under the constraint of sequence independent setup time
    Elissaouy, Oualid
    Allali, Karam
    [J]. RAIRO-OPERATIONS RESEARCH, 2024, 58 (01) : 373 - 395
  • [5] Energy-cost-aware flow-shop scheduling systems with state-dependent energy consumptions
    Aghelinejad, MohammadMohsen
    Ouazene, Yassine
    Yalaoui, Alice
    [J]. INTERNATIONAL CONFERENCE ON SUSTAINABLE ENERGY AND GREEN TECHNOLOGY 2019, 2020, 463
  • [6] Sequence-dependent setup time flexible job shop scheduling problem to minimise total tardiness
    Mousakhani, M.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (12) : 3476 - 3487
  • [7] Minimizing Total Idle Energy Consumption in the Permutation Flow Shop Scheduling Problem
    Liu, Guo-Sheng
    Li, Jin-Jin
    Tang, Ying-Si
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2018, 35 (06)
  • [8] Minimizing the Number of Tardy Jobs in Flow Shop Sequence Dependent Setup Times Scheduling Problem
    Varmazyar, Mohsen
    Salmasi, Nasser
    [J]. MECHANICAL AND AEROSPACE ENGINEERING, PTS 1-7, 2012, 110-116 : 4063 - 4069
  • [9] Minimizing the total flow time and the tardiness in a two-machine flow shop
    Lee, WC
    Wu, CC
    [J]. INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2001, 32 (03) : 365 - 373
  • [10] Comparison of Heuristic for Flow Shop Scheduling Problems with Sequence Dependent Setup time
    Kaweegitbundit, Parinya
    [J]. ADVANCED MANUFACTURING SYSTEMS, 2011, 339 : 332 - 335