共 50 条
- [1] Perceived risk of lock-in in the front-end phase of major transportation projects [J]. Transportation, 2022, 49 : 703 - 733
- [2] A Conceptual Framework for the Assessment of Project Alternatives in the Front-End Phase of Major Transportation Projects [J]. CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 1383 - 1392
- [3] LOCK-IN BASED DIFFERENTIAL FRONT-END FOR RAMAN SPECTROSCOPY APPLICATIONS [J]. 2018 14TH CONFERENCE ON PHD RESEARCH IN MICROELECTRONICS AND ELECTRONICS (PRIME 2018), 2018, : 221 - 224
- [4] Complex impedance measurement front-end based on an on/off lock-in amplifier [J]. PROCEEDINGS OF 2022 IEEE INTERNATIONAL WORKSHOP ON METROLOGY FOR INDUSTRY 4.0 & IOT (IEEE METROIND4.0&IOT), 2022, : 419 - 423
- [10] Analyzing safety strategies at the front-end of projects [J]. RISK, RELIABILITY AND SAFETY: INNOVATING THEORY AND PRACTICE, 2017, : 1201 - 1208