Preprocessing and tightening methods for time-indexed MIP chemical production scheduling models

被引:27
|
作者
Merchan, Andres F. [1 ]
Maravelias, Christos T. [1 ]
机构
[1] Univ Wisconsin, Dept Chem & Biol Engn, Madison, WI 53706 USA
基金
美国国家科学基金会;
关键词
Constraint propagation; Strong valid inequalities; Preprocessing; MULTIPURPOSE BATCH PLANTS; MULTISTAGE MULTIPRODUCT PROCESSES; SHORT-TERM; MIXED-INTEGER; SINGLE-STAGE; DECOMPOSITION TECHNIQUES; GENERAL FRAMEWORK; PROGRAMMING-MODEL; MILP FORMULATION; PARALLEL UNITS;
D O I
10.1016/j.compchemeng.2015.10.003
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We propose a series of preprocessing algorithms for the generation of strong valid inequalities for time-indexed, discrete and continuous, mixed-integer programming scheduling models for problems in network production environments. Specifically, starting from time- and inventory-related instance data, the proposed algorithms use constraint propagation techniques to calculate parameters that are used to bound the number of times subsets of tasks can be executed in a feasible solution. We also extend some of the propagation ideas to generate three classes of new tightening constraints. The proposed methods result in tightening constraints expressed in terms of assignment binary variables (X-ijt = 1 if task i is assigned to start on unit j at time point t) which are present in all time-indexed MIP models, therefore they are applicable to all time-indexed models accounting for a wide range of processing features. Finally, the methods are shown to lead to up to two orders of magnitude reduction in computational time when optimal solutions are found and significantly improve optimality gap when a time limit is enforced. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:516 / 535
页数:20
相关论文
共 46 条
  • [21] Disjunctive and time-indexed formulations for non-preemptive job shop scheduling with resource availability constraints
    Azem, S.
    Aggoune, R.
    Dauzere-Peres, S.
    [J]. 2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 787 - +
  • [22] Coupling time-indexed and big-M formulations for real-time train scheduling during metro service disruptions
    Huang, Yeran
    Mannino, Carlo
    Yang, Lixing
    Tang, Tao
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2020, 133 : 38 - 61
  • [23] Time-indexed formulation and polynomial time heuristic for a multi-dock truck scheduling problem in a cross-docking centre
    Cota, Priscila M.
    Gimenez, Barbara M. R.
    Araujo, Dhiego P. M.
    Nogueira, Thiago H.
    de Souza, Mauricio C.
    Ravetti, Martin G.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 95 : 135 - 143
  • [24] Supervised Machine Learning for Understanding and Improving the Computational Performance of Chemical Production Scheduling MIP Models br
    Kim, Boeun
    Maravelias, Christos T.
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2022, 61 (46) : 17124 - 17136
  • [25] A branch-and-bound algorithm for the solution of chemical production scheduling MIP models using parallel computing
    Velez, Sara
    Maravelias, Christos T.
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2013, 55 : 28 - 39
  • [26] On the equivalence of the max-min transportation lower bound and the time-indexed lower bound for single-machine scheduling problems
    Yunpeng Pan
    Leyuan Shi
    [J]. Mathematical Programming, 2007, 110 : 543 - 559
  • [27] On the equivalence of the max-min transportation lower bound and the time-indexed lower bound for single-machine scheduling problems
    Pan, Yunpeng
    Shi, Leyuan
    [J]. MATHEMATICAL PROGRAMMING, 2007, 110 (03) : 543 - 559
  • [28] Reformulations and Branching Methods for Mixed-Integer Programming Chemical Production Scheduling Models
    Velez, Sara
    Maravelias, Christos T.
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2013, 52 (10) : 3832 - 3841
  • [29] Combining the Advantages of Discrete- and Continuous-time MIP Scheduling Models
    Lee, Hojae
    Maravelias, Christos
    [J]. 29TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT B, 2019, 46 : 1171 - 1176
  • [30] Hourly cooling load forecasting using time-indexed ARX models with two-stage weighted least squares regression
    Guo, Yin
    Nazarian, Ehsan
    Ko, Jeonghan
    Rajurkar, Kamlakar
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2014, 80 : 46 - 53