Estimation of potential flash flood risk in a basin using morphometric parameters: A case study of Akcay Basin

被引:8
|
作者
Kocyigit, Musteyde Baduna [1 ]
Akay, Huseyin [1 ]
机构
[1] Gazi Univ, Dept Civil Engn, TR-06570 Ankara, Turkey
关键词
Akcay basin; flood potential; basin prioritization; morphometric parameters; Yunuslar Hydroelectric Power Plant; QUANTITATIVE-ANALYSIS; FREQUENCY-ANALYSIS; DRAINAGE NETWORKS; PRIORITIZATION; INDIA; SATELLITE; EGYPT; SINAI; RIVER;
D O I
10.17341/gazimmfd.416429
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, the Akcay basin located in Western Black Sea Region was divided into sub basins and the geometrical parameters of those sub basins, the drainage network and the stream orders specified by the Strahler method were determined by using ArcGIS 10.1.Thus, the morphometric parameters of each sub basin were computed.Then, in order to be able to evaluate the sub basins in terms of flood potential, a prioritization method in the literature was adapted and with the usage of the morphometric parameters the sub basins were graded according to their flood potentials. According to the sub basin prioritization carried out, it was determined that the reservoir of the Yunuslar HEPP located in the Akcay basin enclosed the sub basin which had a high flood potential and constituted approximately half of the total drainage area of the basin. Furthermore, it was suggested that construction of a check dam in the sub basin which has the largest drainage area and a river bridge located at its outlet point would reduce the potential effect of the flash flood for both the river bridge and the whole basin. The flash flood potential of all sub basins was also investigated by using lesser number of morphometric parameters according to a graphical method in the literature and the flash flood potential of all sub basins was found to be moderate according to this method.
引用
收藏
页码:1321 / 1332
页数:12
相关论文
共 50 条
  • [21] Soil erosion and flood hazard zonation using morphometric and morphotectonic parameters in Upper Alaknanda river basin
    Neeraj Pant
    Rajendra Kumar Dubey
    Anand Bhatt
    Shive Prakash Rai
    Prabhat Semwal
    Sumit Mishra
    [J]. Natural Hazards, 2020, 103 : 3263 - 3301
  • [22] FLOOD RISK PATTERN RECOGNITION BY USING ENVIRONMETRIC TECHNIQUE: A CASE STUDY IN LANGAT RIVER BASIN
    Saudi, Ahmad Shakir Mohd
    Juahir, Hafizan
    Azid, Azman
    Toriman, Mohd Ekhwan
    Kamarudin, Mohd Khairul Amri
    Saudi, Madihah Mohd
    Mustafa, Ahmad Dasuki
    Amran, Mohammad Azizi
    [J]. JURNAL TEKNOLOGI, 2015, 77 (01):
  • [23] Flood Risk Pattern Recognition Using Chemometric Technique: A Case Study In Kuantan River Basin
    Saudi, Ahmad Shakir Mohd
    Juahir, Hafizan
    Azid, Azman
    Kamarudin, Mohd Khairul Amri
    Kasim, Mohd Fadhil
    Toriman, Mohd Ekhwan
    Aziz, Nor Azlina Abdul
    Hasnam, Che Noraini Che
    Samsudin, Mohd Saiful
    [J]. JURNAL TEKNOLOGI, 2015, 72 (01):
  • [24] Flash Flood Risk Assessment of the Great Kwa River Basin Using Analytical Hierarchy Process
    Ogarekpe, Nkpa Mba
    Nnaji, Chidozie Charles
    Ekpenyong, Maurice George
    [J]. WATER CONSERVATION SCIENCE AND ENGINEERING, 2022, 7 (04) : 599 - 611
  • [25] Estimation of flood damage functions for river basin planning: a case study in Bangladesh
    Yang, Y. C. Ethan
    Ray, Patrick A.
    Brown, Casey M.
    Khalil, Abedalrazq F.
    Yu, Winston H.
    [J]. NATURAL HAZARDS, 2015, 75 (03) : 2773 - 2791
  • [26] Estimation of flood damage functions for river basin planning: a case study in Bangladesh
    Y. C. Ethan Yang
    Patrick A. Ray
    Casey M. Brown
    Abedalrazq F. Khalil
    Winston H. Yu
    [J]. Natural Hazards, 2015, 75 : 2773 - 2791
  • [27] Assessment of vulnerability to flood risk in the Padma River Basin using hydro-morphometric modeling and flood susceptibility mapping
    Abrar, Mohammed Fahim
    Iman, Yasin Edmam
    Mustak, Mubashira Binte
    Pal, Sudip Kumar
    [J]. ENVIRONMENTAL MONITORING AND ASSESSMENT, 2024, 196 (07)
  • [28] Flash Flood Risk Assessment of the Great Kwa River Basin Using Analytical Hierarchy Process
    Nkpa Mba Ogarekpe
    Chidozie Charles Nnaji
    Maurice George Ekpenyong
    [J]. Water Conservation Science and Engineering, 2022, 7 : 599 - 611
  • [29] Uncertainty Estimation During the Process of Flood Risk Assessment in Developing Countries - Case Study in the Pampanga River Basin -
    Okazumi, Toshio
    Miyamoto, Mamoru
    Shrestha, Badri Bhakta
    Gusyev, Maksym
    [J]. JOURNAL OF DISASTER RESEARCH, 2014, 9 (01) : 69 - 77
  • [30] THE ESTIMATION OF FLOOD AREA BASED ON A FEW SELECTED AND WEIGHTED PARAMETERS: CASE STUDY OF THE NANGKA RIVER BASIN, BALIKPAPAN (INDONESIA)
    Sulistyo, Totok
    Respati, Sara
    [J]. JOURNAL OF THE GEOGRAPHICAL INSTITUTE JOVAN CVIJIC SASA, 2023, 73 (02): : 123 - 137