Ice Jam Discharge Frequency and Its Impact on Flood Insurance Elevations

被引:0
|
作者
Zufelt, J. [1 ]
Lefers, A. [2 ]
机构
[1] HDR, Anchorage, AK 99503 USA
[2] AE2S, Madison, WI USA
来源
COLD REGIONS ENGINEERING 2019 | 2019年
关键词
Discharge; flooding; frequency; hydrology; ice jam;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Heart River drains approximately 3,360 square miles in southwest North Dakota, flowing through the city of Mandan, ND, before entering the Missouri River near Bismark, ND. Flood protection and irrigation projects have been constructed over the years in the Heart River basin, including the Heart Butte Dam constructed in 1949 by the U.S. Bureau of Reclamation approximately 100 miles upstream of Mandan. While this altered the hydrology of the basin slightly by providing storage, irrigation opportunities, and increasing evaporation, the Lower Heart River can cause both open water and ice jam flooding in the city of Mandan. Flood protection levees have been constructed over time in Mandan starting in 1959 with improvements added in 1963 and in 1989. An effort to provide increased flood protection and to re-certify the levee system in Mandan to Federal Emergency Management Agency (FEMA) protection levels is being undertaken by the Lower Heart Water Resource District. The effort included a reanalysis of the historic discharge and stage records of the USGS gage at the upstream edge of the city. An analysis of past ice jamming events, river and floodplain geometry, and ice jam mechanics found that there is a peak discharge for which an ice jam can remain in place and that this discharge varies depending on river location and local geometry. The analysis indicated that the 1% annual exceedance probability ice jam discharge is 42,000 cfs, but the peak discharge for which an ice jam could remain in place varied between 15,000 and 25,000 cfs depending on river location. The paper describes the analysis techniques used to develop the combined stage frequency values for the levee recertification.
引用
收藏
页码:336 / 344
页数:9
相关论文
共 50 条
  • [31] ICE JAM FLOOD PREVENTION MEASURES: LAMOILLE RIVER AT HARDWICK, VERMONT, USA.
    Calkins, Darryl J.
    1985, : 149 - 168
  • [32] Ice-Jam Flood Risk Assessment and Hazard Mapping under Future Climate
    Das, Apurba
    Rokaya, Prabin
    Lindenschmidt, Karl-Erich
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2020, 146 (06)
  • [33] Suitability of dynamic modeling for flood forecasting during ice jam release surge events
    Blackburn, J.
    Hicks, F.
    J. Cold Reg. Eng., 1600, 1 (18-36):
  • [34] Ice jam flood forecasting. Hay River, N.W.T
    Stanley, S.J.
    Gerard, R.
    Proceedings - Annual Conference and 1st Biennial Environmental Speciality Conference, 1990, 5
  • [35] Suitability of dynamic modeling for flood forecasting during ice jam release surge events
    Blackburn, J
    Hicks, F
    JOURNAL OF COLD REGIONS ENGINEERING, 2003, 17 (01) : 18 - 36
  • [36] Study on genesis and forecast method of ice-jam flood for the upstream of Nenjiang River
    Xiao, DF
    Liu, ZP
    ICE IN SURFACE WATERS, VOL 2, 1999, : 747 - 751
  • [37] Current status and advancement suggestions of ice-jam flood hazard and risk assessment
    Das, Apurba
    Lindenschmidt, Karl-Erich
    ENVIRONMENTAL REVIEWS, 2020, 28 (04): : 373 - 379
  • [38] Estimation of Yukon River discharge during an ice jam near Dawson City
    Jasek, M
    Muste, M
    Ettema, R
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2001, 28 (05) : 856 - 864
  • [39] The impact of bridge pier on ice jam evolution - an experimental study
    Wang, Jun
    Hua, Jian
    Sui, Jueyi
    Wu, Peng
    Liu, Tao
    Chen, Pangpang
    JOURNAL OF HYDROLOGY AND HYDROMECHANICS, 2016, 64 (01) : 75 - 82
  • [40] Impact of Climate Change on the Frequency of Dynamic Breakup Events and on the Risk of Ice-Jam Floods in Quebec, Canada
    Turcotte, Benoit
    Morse, Brian
    Pelchat, Gabriel
    WATER, 2020, 12 (10) : 1 - 19