共 50 条
- [41] Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness [J]. The International Journal of Advanced Manufacturing Technology, 2009, 41 : 1186 - 1198
- [42] Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (11-12): : 1186 - 1198
- [43] Flow shop scheduling with deteriorating jobs under dominating machines to minimize makespan [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 48 (5-8): : 719 - 723
- [44] Flow shop scheduling with deteriorating jobs under dominating machines to minimize makespan [J]. The International Journal of Advanced Manufacturing Technology, 2010, 48 : 719 - 723
- [50] On-line scheduling on an unbounded parallel batch machine to minimize makespan of two families of jobs [J]. Journal of Scheduling, 2009, 12 : 91 - 97