Design and construction of a launched cable-stayed bridge in China

被引:5
|
作者
Wang, Yingliang [1 ]
Dai, Xiaochun [1 ]
He, Tingguo [1 ]
Dai, Jianbing [2 ]
Zhang, Jiachun [1 ]
机构
[1] China Railway ERYUAN Engn Grp Co Ltd, Chengdu, Sichuan, Peoples R China
[2] China Bridge Grp Co Ltd, Construct Team, Wuhan, Hubei, Peoples R China
关键词
bridges; composite structures; design methods & aids;
D O I
10.1680/jcien.18.00019
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Zhengbei Bridge is a key structure on the new Nongye Road in Zhengzhou, central China. Completed in 2019, it crosses the city's north railway marshalling yard, the biggest in Asia. The main bridge is a cable-stayed structure with a single pylon and two 221 m spans. This paper describes the design and construction of the bridge, including the incremental launching of the steel-concrete composite main girder over temporary trestles between the railway tracks. To avoid disrupting rail operations the trestles were up to 92 m apart, so the 56 m launch nose was supplemented with a kingpost and cables.
引用
收藏
页码:3 / 8
页数:6
相关论文
共 50 条
  • [31] Analysis of temperature effect on cable-stayed bridge at construction stage
    Yang, Jixin
    Yang, Mingchao
    [J]. SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 2204 - 2208
  • [32] THE NEW CABLE-STAYED BRIDGE IN BELGRADE Impressive, but expensive construction
    Nadilo, Branko
    [J]. GRADEVINAR, 2013, 65 (03): : 273 - 281
  • [34] Construction Engineering of Phu My Cable-Stayed Bridge, Vietnam
    Moir, George
    Edmonds, Cohn
    Romberg, Martin
    [J]. STRUCTURAL ENGINEERING INTERNATIONAL, 2010, 20 (03) : 331 - 337
  • [35] The Analysis of Sloping Cable-Stayed Bridge Pylon in Construction Stage
    Wang Xin-zhong
    Li Chuan-xi
    [J]. CIVIL ENGINEERING IN CHINA - CURRENT PRACTICE AND RESEARCH REPORT, 2010, : 108 - +
  • [36] Design of Cable Replacement of a Combined Cable-Stayed and Suspension Pipeline Bridge
    Gao, Hong-Bo
    Ding, Zhi-Kai
    [J]. Bridge Construction, 2017, 47 (02) : 95 - 99
  • [37] Construction of the Cable-Stayed Bridge in the Commercial Port of Venice, Italy
    de Miranda, Mario
    Gnecchi-Ruscone, Elena
    [J]. STRUCTURAL ENGINEERING INTERNATIONAL, 2010, 20 (01) : 13 - 17
  • [38] THE STRUCTURE DESIGN AND CONSTRUCTION FEATURE OF CONCRETE INCLINED PYLON CABLE-STAYED BRIDGE WITH BACKSTAYS
    Jiang, De-Zeng
    Wang, Rong-Hui
    Ma, Niu-Jing
    [J]. ISISS '2009: INNOVATION & SUSTAINABILITY OF STRUCTURES, VOLS 1 AND 2, 2009, : 919 - 924
  • [39] Mechanical Design of a Cable Climbing Robot for Inspection on a Cable-Stayed Bridge
    Zheng, Zhenliang
    Yuan, Xiaoqiang
    Huang, Huanhui
    Yu, Xiao
    Ding, Ning
    [J]. 2018 13TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2018, : 1680 - 1684
  • [40] Review of design and innovative construction of steel truss cable-stayed bridges in China
    Yu, Xiangmin
    Chen, Dewei
    Yu, Jinhong
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2023, 177 (01) : 32 - 45