Effects of Production Control Strategy and Duration Variance on Productivity and Work in Process: Simulation-Based Investigation

被引:10
|
作者
Hajifathalian, Kiarash [1 ]
Wambeke, Brad W. [2 ,4 ]
Liu, Min [1 ]
Hsiang, Simon M. [3 ]
机构
[1] N Carolina State Univ, Dept Civil Construct & Environm Engn, Raleigh, NC 27695 USA
[2] US Mil Acad, Dept Civil & Mech Engn, West Point, NY 10996 USA
[3] Texas Tech Univ, Lubbock, TX 79409 USA
[4] USA, West Point, NY 10996 USA
关键词
Productivity; Work in process; Duration variance; Simulation; CONSTRUCTION;
D O I
10.1061/(ASCE)CO.1943-7862.0000517
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Improving productivity and reducing work-in-process are two activities that can improve project performance, but are often difficult to accomplish. The construction process is complex and consists of a large number of interdependent and sequential tasks. Construction activities are simulated as serial production lines, using state-and resource-based simulation of construction processes simulation models, to investigate the effects that different production control strategies (push/pull and balanced/unbalanced) have on productivity and work-in-process. The sensitivity to task duration variance is also examined for different working strategies. Simulation results are used to compare the models based on their performance. In the presence of duration variance, push strategies result in higher productivity, whereas pull strategies result in lower amounts of work-in-process. Pull strategies are more sensitive to the presence of duration variance. Work-in-process is also a function of the coefficient of variance. Simulation results are used to compare the tradeoffs between strategies. The findings will help construction managers better understand the effects of working strategies and conditions to decide which production control strategy is best suited for their needs. DOI: 10.1061/(ASCE)CO.1943-7862.0000517. (C) 2012 American Society of Civil Engineers.
引用
收藏
页码:1035 / 1043
页数:9
相关论文
共 50 条
  • [31] A simulation-based modelling approach for a production line with nested-loop work sequences
    Tantanawat, Tanakorn
    Hattha, Ekkachart
    Meesublak, Koonlachat
    Phakphonhamin, Vithinut
    JOURNAL OF SIMULATION, 2024, 18 (04) : 584 - 603
  • [32] Simulation-based optimization of process control policies for inventory management in supply chains
    Schwartz, Jay D.
    Wang, Wenlin
    Rivera, Daniel E.
    AUTOMATICA, 2006, 42 (08) : 1311 - 1320
  • [33] Integrated development of nonlinear process planning and simulation-based shop floor control
    Kim, SB
    Woo, JY
    Park, SS
    Jung, BW
    Cho, HB
    PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 1465 - 1468
  • [34] Optimal Configuration in Production Planning and Control: Findings of a Simulation-based Evaluation Study
    Optimale Konfiguration in der Produktionsplanung und -steuerung: Erkenntnisse aus einer simulationsbasierten Evaluierungsstudie
    Lichtenegger, Gerald (gerald.lichtenegger@tugraz.at), 1600, Springer (161):
  • [35] Simulation-Based Optimization of Multistage Separation Process in Offshore Oil and Gas Production Facilities
    Kim, Ik Hyun
    Dan, Seungkyu
    Kim, Hosoo
    Rim, Hung Rae
    Lee, Jong Min
    Yoon, En Sup
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2014, 53 (21) : 8810 - 8820
  • [36] A HEURISTIC SIMULATION-BASED FRAMEWORK TO IMPROVE THE SCHEDULING OF BLOCKS ASSEMBLY AND THE PRODUCTION PROCESS IN SHIPBUILDING
    Basan, Natalia P.
    Achkar, Victoria G.
    Mendez, Carlos A.
    Garcia-del-Valle, Alejandro
    2017 WINTER SIMULATION CONFERENCE (WSC), 2017, : 3218 - 3229
  • [37] The Design of Production Strategy based on Risk Analysis using Process Simulation
    Mitsuyuki, Taiga
    Yamato, Hiroyuki
    Hiekata, Kazuo
    Moser, Bryan
    20TH ISPE INTERNATIONAL CONFERENCE ON CONCURRENT ENGINEERING, 2013, : 244 - 253
  • [38] Simulation investigation on dynamic assembly process based on impedance control
    Huang, Xinhan
    Du, Kelin
    Wang, Min
    Hu, Jianyuan
    Zidonghua Xuebao/Acta Automatica Sinica, 2000, 26 (02): : 169 - 175
  • [39] Simulation-Based Study on a Lane-Based Signal System for Merge Control at Freeway Work Zones
    Yang, Ning
    Chang, Gang-Len
    Kang, Kyeong-Pyo
    JOURNAL OF TRANSPORTATION ENGINEERING, 2009, 135 (01) : 9 - 17
  • [40] REVIEW OF SIMULATION-BASED OPTIMIZATION APPROACHES FOR THE ADAPTIVE SCHEDULING AND CONTROL OF DYNAMIC PRODUCTION SYSTEMS
    Pimentel, R.
    Frazzon, E. M.
    Santos, P. P.
    24TH INTERNATIONAL CONFERENCE ON PRODUCTION RESEARCH (ICPR), 2017, : 657 - 662