Benefits of heavy rail on high-speed railways and design of 75G rail using coordinates

被引:1
|
作者
Sato, Y
机构
[1] Japan Mechanized Wk. and Maintenance, Way Co. Ltd., Tokyo
关键词
heavy rail; high speed railway; rail grinding; rail profile; rail failure;
D O I
10.1016/0043-1648(95)06841-4
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
It has been common practice to use heavy rails on heavy haul railways to reduce rail defects and track deterioration. The clear advantages of using heavy rails on high-speed railways are discussed in the paper. Since future rails should guarantee the dynamic stability of rolling stock and be free of rail defects, it is appropriate to consider modifying the wheel running band formed by rail grinding. The author therefore proposes the use of a new 75 kg rail profile with full use of grinding (designated ''75G rail'') which is developed based on experience in rail profile design in Japan. Mathematical equations have been applied to model the profile in place of drawing.
引用
收藏
页码:163 / 167
页数:5
相关论文
共 50 条
  • [31] Concepts of construction of high-speed rail in Poland in context to the European high-speed rail networks
    Pomykala, Agata
    Engelhardt, Juliusz
    SOCIO-ECONOMIC PLANNING SCIENCES, 2023, 85
  • [32] The Impact of High-Speed Rail on Regional Green Innovation Performance-Based on the Dual Perspective of High-Speed Rail Opening and High-Speed Rail Network
    Zhou, Yanfei
    Fan, Qi
    Tao, Chunliu
    POLISH JOURNAL OF ENVIRONMENTAL STUDIES, 2023, 32 (02): : 1459 - 1472
  • [33] Rail Corrugation of High-Speed Railway Induced by Rail Grinding
    Du, Xing
    Jin, Xuesong
    Zhao, Guotang
    Wen, Zefeng
    Li, Wei
    SHOCK AND VIBRATION, 2021, 2021
  • [34] Rail Corrugation of High-Speed Railway Induced by Rail Grinding
    Du, Xing
    Jin, Xuesong
    Zhao, Guotang
    Wen, Zefeng
    Li, Wei
    Shock and Vibration, 2021, 2021
  • [35] High-speed rail full speed ahead
    Carmichael, Gil
    Forum for Applied Research and Public Policy, 1994, 9 (03):
  • [36] Damage tolerance of fractured rails on continuous welded rail track for high-speed railways
    Yuan Gao
    Ping Wang
    Kai Wang
    Jingmang Xu
    Zhiguo Dong
    Railway Engineering Science, 2021, 29 : 59 - 73
  • [37] RAILWAYS Plans on Track for High-Speed Rail From San Francisco To Los Angeles
    Hill, David
    CIVIL ENGINEERING, 2015, 85 (04): : 35 - 36
  • [38] Damage tolerance of fractured rails on continuous welded rail track for high-speed railways
    Yuan Gao
    Ping Wang
    Kai Wang
    Jingmang Xu
    Zhiguo Dong
    Railway Engineering Science, 2021, 29 (01) : 59 - 73
  • [39] Damage tolerance of fractured rails on continuous welded rail track for high-speed railways
    Gao, Yuan
    Wang, Ping
    Wang, Kai
    Xu, Jingmang
    Dong, Zhiguo
    RAILWAY ENGINEERING SCIENCE, 2021, 29 (01) : 59 - 73
  • [40] New Rail Hubs Along High-Speed Rail Corridor in California Urban Design Challenges
    Loukaitou-Sideris, Anastasia
    TRANSPORTATION RESEARCH RECORD, 2013, (2350) : 1 - 8