bridge engineering; steel box girder; incremental launching construction; finite element analysis;
D O I
10.4028/www.scientific.net/AMR.671-674.974
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
For steel box girder of cable-stayed bridge, which using incremental launching method, during the launching process, structural system and boundary conditions were changing, structure mechanical behaviors were complex. It was necessary to conduct a comprehensive analysis on internal force and deformation of the whole structure during the launching process. Took a cable-stayed bridge with single tower, double cable planes and steel box girder in China as an example; finite element software MIDAS Civil 2010 was used to establish a model for steel box girder, simulation analysis of the entire incremental launching process was carried out. Variation rules and envelopes of the internal force, stress, deformation and support reaction were obtained. The result showed that: the maximum value of positive bending moment after launching complete was 60% of the maximum value of positive bending moment during the launching process. The maximum value of negative bending moment after launching complete was 78% of the maximum value of negative bending moment during the launching process.
引用
收藏
页码:974 / 979
页数:6
相关论文
共 50 条
  • [41] Adaptive finite element analysis of steel girder deck pavement
    Wenhuo Sun
    Lixiong Gu
    Ronghui Wang
    Tiedong Qi
    Journal of Mechanical Science and Technology, 2018, 32 : 593 - 603
  • [42] Finite element analysis of the pre-stressed concrete box-girder bridge with corrugated steel webs
    Li, Shuqin
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING, MATERIALS AND ENERGY (5TH ICMEME2016), 2016, 90 : 1 - 5
  • [43] Effects on Mechanical Behavior in Incremental Launching Method of Pre-stressed Concrete Composite Box Girder With Corrugated Steel Webs
    Chen, Fan
    Liang, Si-han
    Gao, Fu-long
    Li, Bing
    INTERNATIONAL CONFERENCE ON MATERIAL SCIENCE AND CIVIL ENGINEERING, MSCE 2016, 2016, : 104 - 110
  • [44] Research on the Design of Elastic Fulcrum for Continuous Steel Truss Girder with Three Main Trusses in Incremental Launching Construction Craftsmanship
    Liang, Chongshuang
    Ding, Shihong
    Journal of Railway Engineering Society, 2021, 38 (07) : 18 - 21
  • [45] The New Incremental Launching Construction Craftsmanship of Continuous Steel Truss Girder with Three Main Trusses for Both Highway and Railway
    Liang, Chongshuang
    Journal of Railway Engineering Society, 2021, 38 (03) : 41 - 47
  • [46] Finite element modelling of box girder diaphragms at supports
    Univ of Leeds, Leeds, United Kingdom
    Thin-Walled Struct, 1 (25-37):
  • [47] Launching Trajectory Planning for the Variable Cross-Section Steel Box Girder
    Zhang, Hong
    Zhang, Xiaoping
    Guo, Qiang
    Xue, Zhiwu
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ADVANCED MANUFACTURING AND INDUSTRIAL APPLICATION, 2016, 33 : 31 - 37
  • [48] Finite element analysis of reinforced concrete curved box-girder bridges
    Agarwal, Preeti
    Pal, Priyaranjan
    Mehta, Pradeep Kumar
    ADVANCES IN BRIDGE ENGINEERING, 2023, 4 (01):
  • [49] Incremental Launching Construction Method for Steel Truss Suspension Bridge
    Xu, Kaiming
    ADVANCED RESEARCH ON INDUSTRY, INFORMATION SYSTEMS AND MATERIAL ENGINEERING, PTS 1-7, 2011, 204-210 : 842 - 845
  • [50] The Key Technology of Skew Continuous Prestressed Concrete Box Girder Bridges with Incremental Launching Method
    Tian, Zhongchu
    Zeng, Guoliang
    Chen, Min
    Yue, Hailing
    ADVANCES IN CONCRETE AND STRUCTURES, 2009, 400-402 : 639 - 644