Finite Element Analysis on Incremental Launching Construction for Steel Box Girder

被引:7
|
作者
Dai, Jie [1 ]
Di, Jin [1 ]
Qin, Fengjiang [1 ]
Zhao, Min [1 ]
Lu, Wenru [1 ]
机构
[1] Changan Univ, Highway Coll, Xian 710064, Peoples R China
来源
关键词
bridge engineering; steel box girder; incremental launching construction; finite element analysis;
D O I
10.4028/www.scientific.net/AMR.671-674.974
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
For steel box girder of cable-stayed bridge, which using incremental launching method, during the launching process, structural system and boundary conditions were changing, structure mechanical behaviors were complex. It was necessary to conduct a comprehensive analysis on internal force and deformation of the whole structure during the launching process. Took a cable-stayed bridge with single tower, double cable planes and steel box girder in China as an example; finite element software MIDAS Civil 2010 was used to establish a model for steel box girder, simulation analysis of the entire incremental launching process was carried out. Variation rules and envelopes of the internal force, stress, deformation and support reaction were obtained. The result showed that: the maximum value of positive bending moment after launching complete was 60% of the maximum value of positive bending moment during the launching process. The maximum value of negative bending moment after launching complete was 78% of the maximum value of negative bending moment during the launching process.
引用
收藏
页码:974 / 979
页数:6
相关论文
共 50 条
  • [1] Mechanical analysis on incremental launching for the steel box girder
    Wu, Hong Sheng
    Wei, Hua
    Zou, Yu
    Ma, Jun Ming
    Wang, Hai Jun
    Applied Mechanics and Materials, 2014, 633-634 : 1248 - 1251
  • [2] Mechanical Analysis of Steel Box Girder During Incremental Launching
    Wu Hongsheng
    Ma Junming
    Zou Yu
    Wang Haijun
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON LOGISTICS, ENGINEERING, MANAGEMENT AND COMPUTER SCIENCE, 2014, 101 : 446 - 449
  • [3] Improved Incremental Launching Method for Steel Box Girder
    Wu Hongsheng
    Li Yanming
    Zou Yu
    Wang Haijun
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON LOGISTICS, ENGINEERING, MANAGEMENT AND COMPUTER SCIENCE, 2014, 101 : 1129 - 1133
  • [4] CONSTRUCTION OF COMPOSITE BOX-GIRDER BRIDGE BY INCREMENTAL LAUNCHING THE CORRUGATED STEEL WEBS
    He, Jun
    Liu, Yuqing
    Chen, Airong
    Lu, Shaohong
    INNOVATION & SUSTAINABILITY OF STRUCTURES, VOLS 1 AND 2, 2011, : 881 - 887
  • [5] The Dual-Parameter Control of Synchronization in Steel Box Girder Incremental Launching Construction
    Li, Qingfu
    Guo, Hao
    Guo, Biao
    APPLIED SCIENCES-BASEL, 2023, 13 (21):
  • [6] Local Deformation Analysis and Optimization of Steel Box Girder during Incremental Launching
    Zhao, Lin
    Xu, Runze
    Wang, Youzhi
    Tian, Changjin
    Qiu, Kai
    BUILDINGS, 2024, 14 (07)
  • [7] Influence analysis of the incremental launching of steel box girder and local stability control
    Xie, Fu-Jun
    CIVIL, ARCHITECTURE AND ENVIRONMENTAL ENGINEERING, VOLS 1 AND 2, 2017, : 275 - 283
  • [8] Coordinate Monitoring Technology in the Process of Incremental Launching Construction of Curved Steel Box Girder Bridge
    Wang, Haipeng
    Wang, Kai
    Guo, Nan
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022
  • [9] Coordinate Monitoring Technology in the Process of Incremental Launching Construction of Curved Steel Box Girder Bridge
    Wang, Haipeng
    Wang, Kai
    Guo, Nan
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022
  • [10] Patch loading and improved measures of incremental launching of steel box girder
    Zhang, Yezhi
    Luo, Rudeng
    JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2012, 68 (01) : 11 - 19